TPM에서 퍼지 OEE 모형의 개발 및 분석
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 최성운 | - |
dc.date.available | 2020-02-27T13:41:50Z | - |
dc.date.created | 2020-02-12 | - |
dc.date.issued | 2018 | - |
dc.identifier.issn | 2005-7776 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/gachon/handle/2020.sw.gachon/4570 | - |
dc.description.abstract | This paper introduces the method to develop two main types of the fuzzy OEE (Overall Equipment Effectiveness) models via triangular membership function for measuring uncertainty. The fuzzy OEE includes model type 1 and model type 2. The model type 1 is used when the theoretical machine speed only reflects the time loss whereas model type 2 is used when the actual machine speed reflects both time and speed loss. Model type 2 has shown to perform a lower availability rate and a higher performance rate compared to model type 1. In addition, the fuzzy UPH (Unit Per Hour) which is derived from using the fuzzy OEE is presented to satisfy demand uncertainty. The fuzzy UPH can easily measure the fuzzy tact time and cycle time by reciprocating itself. Finally, this study demonstrates the fuzzy OEE models using IVIFS (Interval-Valued Intuitionistic Fuzzy Set) based on the characterization via membership function, non-membership function and hesitant function. For the purpose of analyzing the fuzzy system OEE, the OEE for each machine of plant structure is considered triangular interval-valued intuitionistic fuzzy number. Regardless of plant structure, the validity degree of fuzzy membership function of system OEE decreases when the number of machine with worst value of the validity degree increases. Corresponding examples are presented in this paper for practitioner to understand the applicability and practicability of the proposed fuzzy OEE methods. | - |
dc.language | 한국어 | - |
dc.language.iso | ko | - |
dc.publisher | 한국경영공학회 | - |
dc.relation.isPartOf | 한국경영공학회지 | - |
dc.title | TPM에서 퍼지 OEE 모형의 개발 및 분석 | - |
dc.title.alternative | Development and Analysis of Fuzzy Overall Equipment Effectiveness (OEE) in TPM | - |
dc.type | Article | - |
dc.type.rims | ART | - |
dc.description.journalClass | 2 | - |
dc.identifier.bibliographicCitation | 한국경영공학회지, v.23, no.4, pp.87 - 103 | - |
dc.identifier.kciid | ART002428467 | - |
dc.citation.endPage | 103 | - |
dc.citation.startPage | 87 | - |
dc.citation.title | 한국경영공학회지 | - |
dc.citation.volume | 23 | - |
dc.citation.number | 4 | - |
dc.contributor.affiliatedAuthor | 최성운 | - |
dc.subject.keywordAuthor | Fuzzy OEE (Overall Equipment Effectiveness) | - |
dc.subject.keywordAuthor | Measurement Uncertainty | - |
dc.subject.keywordAuthor | Fuzzy UPH (Unit Per Hour) | - |
dc.subject.keywordAuthor | IVIFS (Interval-Valued Intuitionistic Fuzzy Set) | - |
dc.description.journalRegisteredClass | kci | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
1342, Seongnam-daero, Sujeong-gu, Seongnam-si, Gyeonggi-do, Republic of Korea(13120)031-750-5114
COPYRIGHT 2020 Gachon University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.