Local-Generator-Based Virtual Power Plant Operation Algorithm Considering Operation Time
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Park, Sung-Won | - |
dc.contributor.author | Park, Yong-Gi | - |
dc.contributor.author | Son, Sung-Yong | - |
dc.date.available | 2020-02-27T16:43:47Z | - |
dc.date.created | 2020-02-06 | - |
dc.date.issued | 2017-11 | - |
dc.identifier.issn | 1975-0102 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/gachon/handle/2020.sw.gachon/5556 | - |
dc.description.abstract | A virtual power plant (VPP) is a system that virtually integrates power resources based on the VPP participating customer (VPC) unit and operates as a power plant. When VPP operators manage resources to maximize their benefits, load reduction instructions may focus on more responsive VPCs, or those producing high profitability, by using VPC resources with high operation efficiency. VPCs may thus encounter imbalance problems during operation. This imbalance in operation time would bring more participation for some VPCs, causing potential degradation of their resources. Such an operation strategy would be not preferable for VPP operators in managing the relationship with VPCs. This issue impedes both continual VPC participation and economical and reliable VPP operation in the long term. An operation algorithm is therefore proposed that considers the operation time of VPC generators for mandatory reduction of power resource consumption. The algorithm is based on constraints of daily and annual operation times when VPP operators of local generators perform capacity-market power transactions. The algorithm maximizes the operator benefit through VPP operations. The algorithm implements a penalty parameter for imbalances in operation times spent by VPC generators in fulfilling their obligations. An evaluation was conducted on VPP operational effects by applying the algorithm to the Korean power market. | - |
dc.language | 영어 | - |
dc.language.iso | en | - |
dc.publisher | SPRINGER SINGAPORE PTE LTD | - |
dc.relation.isPartOf | JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY | - |
dc.subject | PROGRAMS | - |
dc.title | Local-Generator-Based Virtual Power Plant Operation Algorithm Considering Operation Time | - |
dc.type | Article | - |
dc.type.rims | ART | - |
dc.description.journalClass | 1 | - |
dc.identifier.wosid | 000417378600005 | - |
dc.identifier.doi | 10.5370/JEET.2017.12.6.2127 | - |
dc.identifier.bibliographicCitation | JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, v.12, no.6, pp.2127 - 2137 | - |
dc.identifier.kciid | ART002277308 | - |
dc.identifier.scopusid | 2-s2.0-85032861385 | - |
dc.citation.endPage | 2137 | - |
dc.citation.startPage | 2127 | - |
dc.citation.title | JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY | - |
dc.citation.volume | 12 | - |
dc.citation.number | 6 | - |
dc.contributor.affiliatedAuthor | Park, Sung-Won | - |
dc.contributor.affiliatedAuthor | Son, Sung-Yong | - |
dc.type.docType | Article | - |
dc.subject.keywordAuthor | Virtual Power Plant (VPP) | - |
dc.subject.keywordAuthor | Optimal operation algorithm | - |
dc.subject.keywordAuthor | Equality operation | - |
dc.subject.keywordAuthor | Operation time | - |
dc.subject.keywordAuthor | Local generator | - |
dc.subject.keywordPlus | PROGRAMS | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Engineering, Electrical & Electronic | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.description.journalRegisteredClass | kci | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
1342, Seongnam-daero, Sujeong-gu, Seongnam-si, Gyeonggi-do, Republic of Korea(13120)031-750-5114
COPYRIGHT 2020 Gachon University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.