Cited 0 time in
A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Kim, Yun-ok | - |
| dc.contributor.author | Lee, Dong-hyuk | - |
| dc.contributor.author | Park, Du-hee | - |
| dc.date.accessioned | 2022-07-06T10:30:28Z | - |
| dc.date.available | 2022-07-06T10:30:28Z | - |
| dc.date.created | 2021-12-08 | - |
| dc.date.issued | 2022-02 | - |
| dc.identifier.issn | 1226-7988 | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/139674 | - |
| dc.description.abstract | The detailed data including spatial concept is not transmitted in the detailed data including the spatial concept in the statement of internal construction sites, and the integrated management of cost and process is not carried out because the construction is carried out on the site with cost-oriented details. so doing a double task of generating the necessary work breakdown structure (WBS) and spatial concept detailed data. In order to solve these problems, in this paper, the classification of information using building information model (BIM) object-based properties, 3D object creation standards, cost, and process information are presented centering on the case of highway construction sites. In the future, BIM-based cost-process integration proposes an efficient construction management practice through management. | - |
| dc.language | 영어 | - |
| dc.language.iso | en | - |
| dc.publisher | KOREAN SOCIETY OF CIVIL ENGINEERS-KSCE | - |
| dc.title | A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction | - |
| dc.type | Article | - |
| dc.contributor.affiliatedAuthor | Park, Du-hee | - |
| dc.identifier.doi | 10.1007/s12205-021-1348-3 | - |
| dc.identifier.scopusid | 2-s2.0-85117392455 | - |
| dc.identifier.wosid | 000709277500001 | - |
| dc.identifier.bibliographicCitation | KSCE JOURNAL OF CIVIL ENGINEERING, v.26, no.2, pp.522 - 538 | - |
| dc.relation.isPartOf | KSCE JOURNAL OF CIVIL ENGINEERING | - |
| dc.citation.title | KSCE JOURNAL OF CIVIL ENGINEERING | - |
| dc.citation.volume | 26 | - |
| dc.citation.number | 2 | - |
| dc.citation.startPage | 522 | - |
| dc.citation.endPage | 538 | - |
| dc.type.rims | ART | - |
| dc.type.docType | Article; Early Access | - |
| dc.identifier.kciid | ART002807238 | - |
| dc.description.journalClass | 1 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
| dc.subject.keywordPlus | Architectural design | - |
| dc.subject.keywordPlus | Budget control | - |
| dc.subject.keywordPlus | Classification (of information) | - |
| dc.subject.keywordPlus | Construction | - |
| dc.subject.keywordPlus | Highway planning | - |
| dc.subject.keywordPlus | Information management | - |
| dc.subject.keywordPlus | Project management | - |
| dc.subject.keywordPlus | Value engineering | - |
| dc.subject.keywordPlus | Building Information Modelling | - |
| dc.subject.keywordPlus | Case-studies | - |
| dc.subject.keywordPlus | CBS | - |
| dc.subject.keywordPlus | Earned value management | - |
| dc.subject.keywordPlus | Highway construction | - |
| dc.subject.keywordPlus | Object based | - |
| dc.subject.keywordPlus | Objects-based | - |
| dc.subject.keywordPlus | Process management | - |
| dc.subject.keywordPlus | Spatial concepts | - |
| dc.subject.keywordPlus | Work breakdown structure | - |
| dc.subject.keywordAuthor | BIM | - |
| dc.subject.keywordAuthor | WBS | - |
| dc.subject.keywordAuthor | CBS | - |
| dc.subject.keywordAuthor | Earned value management | - |
| dc.subject.keywordAuthor | Process management | - |
| dc.identifier.url | https://link.springer.com/article/10.1007/s12205-021-1348-3 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
