Detailed Information

Cited 10 time in webofscience Cited 11 time in scopus
Metadata Downloads

Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building

Full metadata record
DC Field Value Language
dc.contributor.authorMoon, Sungkon-
dc.contributor.authorHam, Namhyuk-
dc.contributor.authorKim, Sungjin-
dc.contributor.authorHou, Lei-
dc.contributor.authorKim, Ju-Hyung-
dc.contributor.authorKim, Jae-Jun-
dc.date.accessioned2022-07-07T14:32:38Z-
dc.date.available2022-07-07T14:32:38Z-
dc.date.created2021-05-12-
dc.date.issued2020-10-
dc.identifier.issn0969-9988-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/144966-
dc.description.abstractPurpose This study, a research project, aims to examine the distinct characteristics of the Fourth Industrial Revolution (4IR), with a focus on construction. Following this examination, the paper presents a field study to evaluate the impact of the 4IR on the construction process. Design/methodology/approach The first half of this project is dedicated to defining the 4IR by reviewing existing literature. The other half of the project presents a case study to demonstrate the concept of the 4IR and measure the effect of its application. To validate the defined concept of the 4IR, the study focuses on the following: autonomous system for producing drawings and robotics in construction. Findings The intensive literature review revealed three unequivocal features of the 4IR: defined tasks, undefined tasks and improvement possibilities. The following case study showed that the incorporation of the three 4IR features resulted in improved productivity and efficiency during the construction of the podium for the Lotte World Tower. For example, the macro-based autonomous system achieved 5.52 shop drawings per hour, highlighting the potential impact of independent, autonomous machinery. Originality/value The originality of this project stems from its attempt to quantify the effectiveness of applying autonomous technologies to a practical project. While previous works in this field have focused on system development and improvement, this paper presents an autonomous system at work in an actual project, in which junior engineers were able to be entirely replaced. The system was successful in independently creating numerous required shop drawings. The value of this analysis is to generate scientific evidence to evaluate the efficacy of the adoption of 4IR-oriented technologies.-
dc.language영어-
dc.language.isoen-
dc.publisherEMERALD GROUP PUBLISHING LTD-
dc.titleFourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building-
dc.typeArticle-
dc.contributor.affiliatedAuthorKim, Ju-Hyung-
dc.contributor.affiliatedAuthorKim, Jae-Jun-
dc.identifier.doi10.1108/ECAM-07-2018-0312-
dc.identifier.scopusid2-s2.0-85084321284-
dc.identifier.wosid000531157900001-
dc.identifier.bibliographicCitationENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, v.27, no.9, pp.2271 - 2286-
dc.relation.isPartOfENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT-
dc.citation.titleENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT-
dc.citation.volume27-
dc.citation.number9-
dc.citation.startPage2271-
dc.citation.endPage2286-
dc.type.rimsART-
dc.type.docTypeArticle-
dc.description.journalClass1-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassssci-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalResearchAreaBusiness & Economics-
dc.relation.journalWebOfScienceCategoryEngineering, Industrial-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.relation.journalWebOfScienceCategoryManagement-
dc.subject.keywordPlusINDUSTRY 4.0-
dc.subject.keywordPlusTRACKING-
dc.subject.keywordPlusSYSTEM-
dc.subject.keywordAuthorConstruction-
dc.subject.keywordAuthorIndustry 4-
dc.subject.keywordAuthor0-
dc.subject.keywordAuthorConstruction-
dc.subject.keywordAuthorAutonomous system-
dc.identifier.urlhttps://www.emerald.com/insight/content/doi/10.1108/ECAM-07-2018-0312/full/html-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Ju Hyung photo

Kim, Ju Hyung
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE