Detailed Information

Cited 9 time in webofscience Cited 0 time in scopus
Metadata Downloads

Optimal BIM staffing in construction projects using a queueing model

Authors
Ham, NamhyukMoon, SungkonKim, Ju-HyungKim, Jae-Jun
Issue Date
May-2020
Publisher
ELSEVIER
Keywords
BIM staffing; Queueing model; BIM RFIs; Waiting time; Waiting cost
Citation
AUTOMATION IN CONSTRUCTION, v.113, pp.1 - 14
Indexed
SCIE
SCOPUS
Journal Title
AUTOMATION IN CONSTRUCTION
Volume
113
Start Page
1
End Page
14
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/145724
DOI
10.1016/j.autcon.2020.103123
ISSN
0926-5805
Abstract
BIM staff plays the important role of providing required information from digital models to project participants. A dilemma is determining the appropriate capacity of BIM staff without sacrificing efficiency in terms of human resource costs. Despite the importance of BIM staffing, its effects on the productivity and performance of construction projects have rarely been investigated. This study presents a framework for quantifying the impact of BIM staffing. First, this study proposes a method to evaluate the activities of BIM staff by introducing a time-dependent queueing model. Second, the proposed framework is validated with data from three real-world projects in which BIM was applied. The effects of BIM staffing on the waiting time of project participants are quantitatively analyzed using time and cost indicators. The results show that decisions about optimal BIM staffing can be made by considering the waiting costs of project participants.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Jae Jun photo

Kim, Jae Jun
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE