디지털 패브리케이션 전문 건설업체 역할 및 성과 분석- 비정형 포디움 시공 사례를 중심으로 -
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 함남혁 | - |
dc.contributor.author | 안병주 | - |
dc.contributor.author | 김재준 | - |
dc.date.accessioned | 2022-07-12T07:36:39Z | - |
dc.date.available | 2022-07-12T07:36:39Z | - |
dc.date.created | 2021-05-13 | - |
dc.date.issued | 2018-03 | - |
dc.identifier.issn | 2288-1697 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/150393 | - |
dc.description.abstract | Recently, there have been increasing studies on the application of digital technology, which has its focus of the irregularbuilding. However, most of these studies have not clarified the objective of the technology and the effectiveness of professional manpoweron its performance. This study analyzes actual used technology and the role of specialty contractor. It presents a framework to quantify theperformance of the specialty contractor. For these purposes, this paper presents a proposed method to evaluate the activities of specialtycontractors using a queueing model. As an attempt to verify the model, an actual irregular building project, in which digital fabricationis applied, is investigated during the construction phase. In order to collect the digital fabrication data, digital fabrication reports andspecialty contractor`s work log of project are reviewed. In addition, Digital Fabrication input personnel, productivity data are collectedthrough interviews with experts involving in the case project. Analysis of specialty contractor`s performance in digital fabrication revealsthat the wait status of project participants varies probabilistically depending on the digital technology application level. The results of thisstudy are expected to contribute toward the improvement of the production level in the construction industry. | - |
dc.language | 한국어 | - |
dc.language.iso | ko | - |
dc.publisher | 한국BIM학회 | - |
dc.title | 디지털 패브리케이션 전문 건설업체 역할 및 성과 분석- 비정형 포디움 시공 사례를 중심으로 - | - |
dc.title.alternative | Specialty Contractor’s Role and Performance Analysis for Digital Fabrication - Focusing on the case of irregular podium construction - | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | 김재준 | - |
dc.identifier.doi | 10.13161/kibim.2018.8.1.043 | - |
dc.identifier.bibliographicCitation | KIBIM Magazine, v.8, no.1, pp.43 - 55 | - |
dc.relation.isPartOf | KIBIM Magazine | - |
dc.citation.title | KIBIM Magazine | - |
dc.citation.volume | 8 | - |
dc.citation.number | 1 | - |
dc.citation.startPage | 43 | - |
dc.citation.endPage | 55 | - |
dc.type.rims | ART | - |
dc.identifier.kciid | ART002336533 | - |
dc.description.journalClass | 2 | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | kci | - |
dc.subject.keywordAuthor | 비정형 건축 | - |
dc.subject.keywordAuthor | 디지털 패브리케이션 | - |
dc.subject.keywordAuthor | 전문 건설업체 | - |
dc.subject.keywordAuthor | 제작도면 | - |
dc.subject.keywordAuthor | 대기행렬 모형 | - |
dc.subject.keywordAuthor | Free-form Architecture | - |
dc.subject.keywordAuthor | Digital Fabrication | - |
dc.subject.keywordAuthor | Specialty Contractor | - |
dc.subject.keywordAuthor | Fabrication Document | - |
dc.subject.keywordAuthor | Queueing Model | - |
dc.identifier.url | http://koreascience.or.kr/article/JAKO201818459283091.page | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1365
COPYRIGHT © 2021 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.