Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석

Full metadata record
DC Field Value Language
dc.contributor.author김형진-
dc.contributor.author유무영-
dc.contributor.author김재준-
dc.contributor.author최창식-
dc.date.accessioned2022-07-13T11:33:09Z-
dc.date.available2022-07-13T11:33:09Z-
dc.date.created2021-05-13-
dc.date.issued2017-09-
dc.identifier.issn2288-1697-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/151643-
dc.description.abstractBIM is effective to improve the labor productivity of construction participants . From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.-
dc.language한국어-
dc.language.isoko-
dc.publisher한국BIM학회-
dc.title사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석-
dc.title.alternativePerformance Analysis of BIM Labor using Case Analysis-
dc.typeArticle-
dc.contributor.affiliatedAuthor김재준-
dc.contributor.affiliatedAuthor최창식-
dc.identifier.doi10.13161/kibim.2017.031-
dc.identifier.bibliographicCitationKIBIM Magazine, v.7, no.3, pp.31 - 39-
dc.relation.isPartOfKIBIM Magazine-
dc.citation.titleKIBIM Magazine-
dc.citation.volume7-
dc.citation.number3-
dc.citation.startPage31-
dc.citation.endPage39-
dc.type.rimsART-
dc.identifier.kciidART002272534-
dc.description.journalClass2-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClasskci-
dc.description.journalRegisteredClassother-
dc.subject.keywordAuthor빌딩정보모델-
dc.subject.keywordAuthorBIM인력-
dc.subject.keywordAuthor대기행렬-
dc.subject.keywordAuthor성과-
dc.subject.keywordAuthorBIM-
dc.subject.keywordAuthorBIM Labor-
dc.subject.keywordAuthorQueue Waiting Line-
dc.subject.keywordAuthorPerformance-
dc.identifier.urlhttp://koreascience.or.kr/article/JAKO201732060956334.page-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Choi, Chang Sik photo

Choi, Chang Sik
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE