Cited 0 time in
공사중단 철골조에서의 임시사용 캡슐 디자인 연구 - 안양역 앞 현대코아 건물을 중심으로
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 정다은 | - |
| dc.contributor.author | 안기현 | - |
| dc.date.accessioned | 2022-07-15T05:14:42Z | - |
| dc.date.available | 2022-07-15T05:14:42Z | - |
| dc.date.created | 2021-05-14 | - |
| dc.date.issued | 2016-10 | - |
| dc.identifier.issn | 2287-5786 | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/153719 | - |
| dc.description.abstract | In modern architecture, steel frame structure is something we can see most often. However, there are more than thousand steel structures left alone after the construction has been stopped in many reasons. This study suggests a capsule design to use for building temporarily by steel frame structure. This study suggests a design on Hyundai core building in the traffic plaza, facing Anyang subway station. That is a large scale construction site, carried out from June, 1996. Construction had been stopped for the reason that IMF cold wave in 1998. And totally ceased in January, in the same year. Therefore, there has been left 430 hundred million won(krw) damage by 326 people who won the ownership of that building. So this study is supposing the problem solved in the near future and enable to use the building temporarily. | - |
| dc.language | 한국어 | - |
| dc.language.iso | ko | - |
| dc.publisher | 대한건축학회 | - |
| dc.title | 공사중단 철골조에서의 임시사용 캡슐 디자인 연구 - 안양역 앞 현대코아 건물을 중심으로 | - |
| dc.title.alternative | A study on the design of temporarily usable capsule on stopped steel frame construction : Designed on Hyundai core building, Anyang, Korea | - |
| dc.type | Article | - |
| dc.contributor.affiliatedAuthor | 안기현 | - |
| dc.identifier.bibliographicCitation | 대한건축학회 2016년도 추계학술발표대회논문집, v.36, no.2, pp.1888 - 1890 | - |
| dc.relation.isPartOf | 대한건축학회 2016년도 추계학술발표대회논문집 | - |
| dc.citation.title | 대한건축학회 2016년도 추계학술발표대회논문집 | - |
| dc.citation.volume | 36 | - |
| dc.citation.number | 2 | - |
| dc.citation.startPage | 1888 | - |
| dc.citation.endPage | 1890 | - |
| dc.type.rims | ART | - |
| dc.type.docType | Proceeding | - |
| dc.description.journalClass | 3 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | other | - |
| dc.subject.keywordAuthor | 임시사용 | - |
| dc.subject.keywordAuthor | 철골구조 | - |
| dc.subject.keywordAuthor | 공사중단 | - |
| dc.subject.keywordAuthor | 캡슐 | - |
| dc.subject.keywordAuthor | Temporary Use | - |
| dc.subject.keywordAuthor | Steel Frame | - |
| dc.subject.keywordAuthor | Construction Ceased | - |
| dc.subject.keywordAuthor | Capsule | - |
| dc.identifier.url | https://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE07156580 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
