Cited 0 time in
디자인 초기 단계에서 소형프로젝트의 BIM 활용 분석 및 방안
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 이계현 | - |
| dc.contributor.author | 함남혁 | - |
| dc.contributor.author | 김재준 | - |
| dc.date.accessioned | 2022-07-16T13:08:26Z | - |
| dc.date.available | 2022-07-16T13:08:26Z | - |
| dc.date.created | 2021-05-13 | - |
| dc.date.issued | 2012-10 | - |
| dc.identifier.issn | 2287-5786 | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/164403 | - |
| dc.description.abstract | Architectural design as the depression in the industry continued downturn is accelerating toward and company that have oneor within five staff is increasing.Even if the project proceeds, in these circumstances, the process of architectural design phasea minimum of three or more staff are needed, but due to lack of manpower caused by interfering with business, and ultimatelythe quality of the design and also the vicious cycle of increasingly falling continues.The introduction of BIM of small designcompany in carrying out the best way to cover the lack of manpower.And the use of BIM in the early stages of design moreaccurately laws review to analyze.In addition, for each process, such as mechanical, electrical, civil engineering, collaborationalso minimizes the possible.This study is expected to be utilized as the basis for the adoption of BIM small project. | - |
| dc.language | 한국어 | - |
| dc.language.iso | ko | - |
| dc.publisher | 대한건축학회 | - |
| dc.title | 디자인 초기 단계에서 소형프로젝트의 BIM 활용 분석 및 방안 | - |
| dc.title.alternative | An Analysis on BIM Utilization of Small Architectural Project in Early Stage of Design Prosess | - |
| dc.type | Article | - |
| dc.contributor.affiliatedAuthor | 김재준 | - |
| dc.identifier.bibliographicCitation | 대한건축학회 추계학술발표대회논문집, v.32, no.2, pp.183 - 184 | - |
| dc.relation.isPartOf | 대한건축학회 추계학술발표대회논문집 | - |
| dc.citation.title | 대한건축학회 추계학술발표대회논문집 | - |
| dc.citation.volume | 32 | - |
| dc.citation.number | 2 | - |
| dc.citation.startPage | 183 | - |
| dc.citation.endPage | 184 | - |
| dc.type.rims | ART | - |
| dc.type.docType | Proceeding | - |
| dc.description.journalClass | 2 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | other | - |
| dc.subject.keywordAuthor | BIM | - |
| dc.subject.keywordAuthor | 디자인 프로세스 | - |
| dc.subject.keywordAuthor | 디자인 매니지먼트 | - |
| dc.subject.keywordAuthor | 법규 검토 | - |
| dc.subject.keywordAuthor | BIM | - |
| dc.subject.keywordAuthor | Design Process | - |
| dc.subject.keywordAuthor | Design Management | - |
| dc.subject.keywordAuthor | Law | - |
| dc.identifier.url | https://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE02216684 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
