Cited 0 time in
소형 건축설계 사무소의 디자인 매니지먼트를 위한 BIM 활용 분석 및 방안
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 이계현 | - |
| dc.contributor.author | 함남혁 | - |
| dc.contributor.author | 김주형 | - |
| dc.contributor.author | 김재준 | - |
| dc.date.accessioned | 2022-07-16T15:50:31Z | - |
| dc.date.available | 2022-07-16T15:50:31Z | - |
| dc.date.created | 2021-05-13 | - |
| dc.date.issued | 2012-04 | - |
| dc.identifier.issn | 2092-7819 | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/165795 | - |
| dc.description.abstract | Architectural design as the depression continued downturn in the industry is accelerating, and or a small design firm of one or five more worker barely maintain. in these circumstances, Even if the project progresses, small architectural design phase of the process requires a minimum of three or more workers, But due to lack of worker caused interfere with work, and ultimately the quality of the design are also increasingly falling vicious cycle continues. Worker to accomplish the project's lack of resolve is the introduction of BIM that can be done. The introduction of BIM drawings needed to express it is possible to minimize manpower and time. In this study, the introduction of BIM and the practical use for small design firm will be discussed. | - |
| dc.language | 한국어 | - |
| dc.language.iso | ko | - |
| dc.publisher | 대한건축학회 | - |
| dc.title | 소형 건축설계 사무소의 디자인 매니지먼트를 위한 BIM 활용 분석 및 방안 | - |
| dc.title.alternative | An Analysis on BIM Utilization of Small Architectural Firms for Design Management | - |
| dc.type | Article | - |
| dc.contributor.affiliatedAuthor | 김주형 | - |
| dc.contributor.affiliatedAuthor | 김재준 | - |
| dc.identifier.bibliographicCitation | 대한건축학회 춘계학술발표대회논문집 계획계, v.32, no.1, pp.155 - 156 | - |
| dc.relation.isPartOf | 대한건축학회 춘계학술발표대회논문집 계획계 | - |
| dc.citation.title | 대한건축학회 춘계학술발표대회논문집 계획계 | - |
| dc.citation.volume | 32 | - |
| dc.citation.number | 1 | - |
| dc.citation.startPage | 155 | - |
| dc.citation.endPage | 156 | - |
| dc.type.rims | ART | - |
| dc.type.docType | Proceeding | - |
| dc.description.journalClass | 2 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | other | - |
| dc.subject.keywordAuthor | BIM | - |
| dc.subject.keywordAuthor | 디자인 프로세스 | - |
| dc.subject.keywordAuthor | 디자인 매니지먼트 | - |
| dc.subject.keywordAuthor | BIM | - |
| dc.subject.keywordAuthor | Design Process | - |
| dc.subject.keywordAuthor | Design Management | - |
| dc.identifier.url | https://www.auric.or.kr/User/Rdoc/DocRdoc.aspx?returnVal=RD_R&dn=255910#.YgyiGOhByUk | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
