Scheduling for a Reconfigurable Manufacturing System with Multiple Process Plans and Limited Pallets/Fixtures
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Yu, Jae-Min | - |
dc.contributor.author | Doh, Hyoung-Ho | - |
dc.contributor.author | Kim, Ji-Su | - |
dc.contributor.author | Lee, Dong-Ho | - |
dc.contributor.author | Nam, Sung-Ho | - |
dc.date.accessioned | 2022-07-16T16:40:42Z | - |
dc.date.available | 2022-07-16T16:40:42Z | - |
dc.date.created | 2021-05-13 | - |
dc.date.issued | 2012-02 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/166255 | - |
dc.description.abstract | A reconfigurable manufacturing system (RMS) is an advanced system designed at the outset for rapid changes in its hardware and software components in order to quickly adjust its production capacity and functionally. Among various operational decisions, this study considers the scheduling problem that determines the input sequence and schedule at the same time for a given set of parts. In particular, we consider the practical constraints that the numbers of pallets/fixtures are limited and hence a part can be released into the system only when the fixture required for the part is available. To solve the integrated input sequencing and scheduling problems, we suggest a priority rule based approach in which the two sub-problems are solved using a combination of priority rules. To show the effectiveness of various rule combinations, a simulation experiment was done on the data for a real RMS, and the test results are reported. | - |
dc.language | 영어 | - |
dc.language.iso | en | - |
dc.publisher | World Academy of Science, Engineering and Technology | - |
dc.title | Scheduling for a Reconfigurable Manufacturing System with Multiple Process Plans and Limited Pallets/Fixtures | - |
dc.title.alternative | Fixtures | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Lee, Dong-Ho | - |
dc.identifier.doi | 10.5281/zenodo.1086235 | - |
dc.identifier.bibliographicCitation | Proceedings of the International Conference on Manufacturing Engineering, v.6, no. 2, pp. 414 - 419 | - |
dc.relation.isPartOf | Proceedings of the International Conference on Manufacturing Engineering | - |
dc.citation.title | Proceedings of the International Conference on Manufacturing Engineering | - |
dc.citation.volume | 6 | - |
dc.citation.number | 2 | - |
dc.citation.startPage | 414 | - |
dc.citation.endPage | 419 | - |
dc.type.rims | ART | - |
dc.type.docType | Proceeding | - |
dc.description.journalClass | 1 | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | other | - |
dc.subject.keywordPlus | Reconfigurable manufacturing system | - |
dc.subject.keywordPlus | scheduling, priority rules | - |
dc.subject.keywordPlus | multiple process plans | - |
dc.subject.keywordPlus | pallets/fixtures | - |
dc.identifier.url | https://publications.waset.org/16007/scheduling-for-a-reconfigurable-manufacturing-system-with-multiple-process-plans-and-limited-palletsfixtures | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1365
COPYRIGHT © 2021 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.