Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

A heuristic for multi-period disassembly leveling and scheduling

Full metadata record
DC Field Value Language
dc.contributor.authorKim, Dong-Ho-
dc.contributor.authorLee, Dong-Ho-
dc.date.accessioned2022-07-16T17:46:52Z-
dc.date.available2022-07-16T17:46:52Z-
dc.date.created2021-05-13-
dc.date.issued2011-12-
dc.identifier.issn0000-0000-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/166917-
dc.description.abstractWe consider disassembly leveling and scheduling for multiple product types with parts commonality. Disassembly leveling, one of disassembly process planning decisions, is to determine disassembly structures that specify parts and subassemblies to be obtained from used/end-of-life products, and disassembly scheduling is the problem of determining the timing and quantity of disassembling products and their subassemblies to satisfy the demands of their parts and/or subassemblies. Unlike the previous studies, we consider the two problems at the same time, especially in multi-period version for the objective of minimizing the sum of disassembly setup, disassembly operation and inventory holding costs. In particular, we consider the general case that disassembly levels may be different for products of the same type and different periods. To represent the integrated problem mathematically, an integer programming model is developed. Then, as an initial solution approach, a simple greedy heuristic using a priority rule is suggested and its performance is reported.-
dc.language영어-
dc.language.isoen-
dc.publisherIEEE-
dc.titleA heuristic for multi-period disassembly leveling and scheduling-
dc.typeArticle-
dc.contributor.affiliatedAuthorLee, Dong-Ho-
dc.identifier.doi10.1109/SII.2011.6147544-
dc.identifier.scopusid2-s2.0-84863122498-
dc.identifier.bibliographicCitation2011 IEEE/SICE International Symposium on System Integration, SII 2011, pp.762 - 767-
dc.relation.isPartOf2011 IEEE/SICE International Symposium on System Integration, SII 2011-
dc.citation.title2011 IEEE/SICE International Symposium on System Integration, SII 2011-
dc.citation.startPage762-
dc.citation.endPage767-
dc.type.rimsART-
dc.type.docTypeConference Paper-
dc.description.journalClass1-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscopus-
dc.subject.keywordPlusDisassembly operations-
dc.subject.keywordPlusDisassembly process planning-
dc.subject.keywordPlusDisassembly scheduling-
dc.subject.keywordPlusGreedy heuristics-
dc.subject.keywordPlusInitial solution-
dc.subject.keywordPlusInteger programming models-
dc.subject.keywordPlusInventory holding-
dc.subject.keywordPlusMulti-period-
dc.subject.keywordPlusMultiple products-
dc.subject.keywordPlusPriority rules-
dc.subject.keywordPlusComputer programming-
dc.subject.keywordPlusInteger programming-
dc.subject.keywordPlusIntegration-
dc.subject.keywordPlusScheduling-
dc.identifier.urlhttps://ieeexplore.ieee.org/document/6147544-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE