Cited 0 time in
A hierarchical approach for the capacitated lot-sizing and scheduling problem with a special structure of sequence-dependent setups
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Kwak, Ik-Soon | - |
| dc.contributor.author | Jeong, In-Jae | - |
| dc.date.accessioned | 2022-07-16T17:47:38Z | - |
| dc.date.available | 2022-07-16T17:47:38Z | - |
| dc.date.issued | 2011-12 | - |
| dc.identifier.issn | 0020-7543 | - |
| dc.identifier.issn | 1366-588X | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/166924 | - |
| dc.description.abstract | This research deals with the single machine multi-product capacitated lot-sizing and scheduling problem (CLSP) with sequence-dependent setup times and setup costs. The CLSP determines the production quantities and the sequence to satisfy deterministic and dynamic demand during multiple periods. The objective is to minimise the total sum of the inventory holding costs and the sequence-dependent setup costs. We consider a special form of sequence-dependent setup times where the larger product we produce next, the more setup time we need. As a solution approach, we propose a two-level hierarchical method consisting of upper-level planning and the lower-level planning. In the upper-level planning, we solve the lot-sizing problem with estimated sequence-independent setup times utilising the characteristic of the special structure of setup times. Then we solve the scheduling problem in the lower-level planning. The proposed method is compared with the single-level optimal CLSP solution and an existing heuristic developed for the uniform structure of setup times. | - |
| dc.format.extent | 15 | - |
| dc.language | 영어 | - |
| dc.language.iso | ENG | - |
| dc.publisher | Taylor & Francis | - |
| dc.title | A hierarchical approach for the capacitated lot-sizing and scheduling problem with a special structure of sequence-dependent setups | - |
| dc.type | Article | - |
| dc.publisher.location | 영국 | - |
| dc.identifier.doi | 10.1080/00207543.2010.543170 | - |
| dc.identifier.scopusid | 2-s2.0-84855757121 | - |
| dc.identifier.wosid | 000299897100011 | - |
| dc.identifier.bibliographicCitation | International Journal of Production Research, v.49, no.24, pp 7425 - 7439 | - |
| dc.citation.title | International Journal of Production Research | - |
| dc.citation.volume | 49 | - |
| dc.citation.number | 24 | - |
| dc.citation.startPage | 7425 | - |
| dc.citation.endPage | 7439 | - |
| dc.type.docType | Article | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | sci | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalResearchArea | Operations Research & Management Science | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Industrial | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Manufacturing | - |
| dc.relation.journalWebOfScienceCategory | Operations Research & Management Science | - |
| dc.subject.keywordPlus | PARALLEL MACHINES | - |
| dc.subject.keywordPlus | COSTS | - |
| dc.subject.keywordPlus | TIMES | - |
| dc.subject.keywordPlus | COMPLEXITY | - |
| dc.subject.keywordPlus | ALGORITHMS | - |
| dc.subject.keywordAuthor | capacitated lot-sizing | - |
| dc.subject.keywordAuthor | two-level hierarchical plan | - |
| dc.subject.keywordAuthor | sequence-dependent | - |
| dc.identifier.url | https://www.tandfonline.com/doi/full/10.1080/00207543.2010.543170 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
