Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

철골공사에서의 타워크레인 양중계획 프로세스에 관한 연구

Full metadata record
DC Field Value Language
dc.contributor.author정덕기-
dc.contributor.author박정로-
dc.contributor.author김주형-
dc.contributor.author김재준-
dc.date.accessioned2022-07-16T18:09:20Z-
dc.date.available2022-07-16T18:09:20Z-
dc.date.created2021-05-13-
dc.date.issued2011-11-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/167057-
dc.description.abstractLifting plan in conjunction with the overall construction plan will be established. It is being created by executive director of the Corporation and other such as an experienced site manager. But, written lifting plan based on the limited information and experience is causing some problems such as decreasing productivity, workability loss, delay. The reasons for the problems are lack of prediction of construction execution, inappropriate materials on the past performance, individual experience, limits of knowledge, lack of technical materials, shortage of advisor. Therefore, to solve the problems, we have to overcome the situation in which we depends on lifting planner's experience and intuition, limited information by accumulating objective and reliable materials. Because unorganized lifting plan will lower efficiency of lifting equipment and make reducing construction period difficult. In this study, influence factors on lifting plans will be derived through reviewing literatures and lifting plan cases. Derived influence factors will be classified as components and classes, classified influence factors are assessed suitability. Also, Decision making items are derived from the factors. Finally, tower crane lifting plan process will be suggested from the result.-
dc.language한국어-
dc.language.isoko-
dc.publisher한국건축시공학회-
dc.title철골공사에서의 타워크레인 양중계획 프로세스에 관한 연구-
dc.title.alternativeA Study on the Process of Tower Crane Construction Planning in Steel Structure-
dc.typeArticle-
dc.contributor.affiliatedAuthor김주형-
dc.contributor.affiliatedAuthor김재준-
dc.identifier.bibliographicCitation한국건축시공학회 2011년 추계학술발표대회 논문집, v.11, no.2, pp.145 - 146-
dc.relation.isPartOf한국건축시공학회 2011년 추계학술발표대회 논문집-
dc.citation.title한국건축시공학회 2011년 추계학술발표대회 논문집-
dc.citation.volume11-
dc.citation.number2-
dc.citation.startPage145-
dc.citation.endPage146-
dc.type.rimsART-
dc.type.docTypeProceeding-
dc.description.journalClass3-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassother-
dc.subject.keywordAuthor타워크레인-
dc.subject.keywordAuthor양중계획-
dc.subject.keywordAuthor철골공사-
dc.subject.keywordAuthortower crane-
dc.subject.keywordAuthorlifting plan-
dc.subject.keywordAuthorsteel structure construction-
dc.identifier.urlhttps://www.auric.or.kr/User/Rdoc/DocRdoc.aspx?returnVal=RD_R&dn=252631#.YhSLq-hBxPY-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Ju Hyung photo

Kim, Ju Hyung
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE