Development of a Progress Management System Integrated with the Quality Inspection Process: Case of a nuclear power plant construction project in Korea
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Kwahk, Kil-Jong | - |
dc.contributor.author | Park, Min-Ho | - |
dc.contributor.author | Kim, Ju-Hyung | - |
dc.contributor.author | Kim, Jae-Jun | - |
dc.date.accessioned | 2022-07-16T18:23:38Z | - |
dc.date.available | 2022-07-16T18:23:38Z | - |
dc.date.created | 2021-05-12 | - |
dc.date.issued | 2011-11 | - |
dc.identifier.issn | 1346-7581 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/167244 | - |
dc.description.abstract | In this paper, the authors present the concept of a progress management system that synchronizes the quality inspection process with integrated cost-schedule information in construction projects. In general, construction progress has been measured using subjective judgments by field managers or extensively processed cost data. A practical progress management system should be able to maintain and provide objective and reliable progress data on time without extra data processing. The quality inspection process can produce appropriate data for this purpose. However, in conventional construction management practices, progress measurement and quality inspection have been separated. In order to design and implement a system that synchronizes them, the available information that can be provided from current processes were identified and connected using the following steps: 1) analyzing the quality inspection process, 2) identifying the means for measuring progress, 3) determining identical elements in various schedules, and 4) linking quality inspection lots to the means for measuring progress. An on-line system was developed and applied to a nuclear power plant construction project in Korea. The results from operating it show that the conflicts in progress determination between clients and contractors were reduced, and the costs and time for administrative tasks involving the processing of progress management and quality inspection data were saved. | - |
dc.language | 영어 | - |
dc.language.iso | en | - |
dc.publisher | TAYLOR & FRANCIS LTD | - |
dc.title | Development of a Progress Management System Integrated with the Quality Inspection Process: Case of a nuclear power plant construction project in Korea | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Kim, Ju-Hyung | - |
dc.contributor.affiliatedAuthor | Kim, Jae-Jun | - |
dc.identifier.doi | 10.3130/jaabe.10.391 | - |
dc.identifier.scopusid | 2-s2.0-82755167789 | - |
dc.identifier.wosid | 000297629100015 | - |
dc.identifier.bibliographicCitation | JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, v.10, no.2, pp.391 - 398 | - |
dc.relation.isPartOf | JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING | - |
dc.citation.title | JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING | - |
dc.citation.volume | 10 | - |
dc.citation.number | 2 | - |
dc.citation.startPage | 391 | - |
dc.citation.endPage | 398 | - |
dc.type.rims | ART | - |
dc.type.docType | Article | - |
dc.description.journalClass | 1 | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | ahci | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Architecture | - |
dc.relation.journalResearchArea | Construction & Building Technology | - |
dc.relation.journalWebOfScienceCategory | Architecture | - |
dc.relation.journalWebOfScienceCategory | Construction & Building Technology | - |
dc.subject.keywordPlus | Administrative data processing | - |
dc.subject.keywordPlus | Costs | - |
dc.subject.keywordPlus | Data handling | - |
dc.subject.keywordPlus | Image quality | - |
dc.subject.keywordPlus | Inspection | - |
dc.subject.keywordPlus | Nuclear energy | - |
dc.subject.keywordPlus | Nuclear fuels | - |
dc.subject.keywordPlus | Nuclear power plants | - |
dc.subject.keywordPlus | Project management | - |
dc.subject.keywordPlus | Construction progress | - |
dc.subject.keywordPlus | Construction projects | - |
dc.subject.keywordPlus | Conventional constructions | - |
dc.subject.keywordPlus | Cost-schedule integrations | - |
dc.subject.keywordPlus | Design and implements | - |
dc.subject.keywordPlus | Power plant construction | - |
dc.subject.keywordPlus | Progress | - |
dc.subject.keywordPlus | Progress measurement | - |
dc.subject.keywordPlus | Information management | - |
dc.subject.keywordAuthor | information systems (IS) | - |
dc.subject.keywordAuthor | progress | - |
dc.subject.keywordAuthor | quality | - |
dc.subject.keywordAuthor | cost-schedule integration | - |
dc.identifier.url | https://www.tandfonline.com/doi/abs/10.3130/jaabe.10.391 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1365
COPYRIGHT © 2021 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.