Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

A STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA

Full metadata record
DC Field Value Language
dc.contributor.authorLi, Teng-
dc.contributor.authorKim, Jae Jun-
dc.contributor.authorKim, Ju Hyung-
dc.date.accessioned2022-07-16T21:40:19Z-
dc.date.available2022-07-16T21:40:19Z-
dc.date.created2021-05-13-
dc.date.issued2011-02-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/168996-
dc.description.abstractProject delivery systems have evolved over the years. Continuous changes in technology and the increasing sophistication in buildings required specialization of design and construction services. IPD as a delivery method has been used in the USA and other countries. With the development of BIM, lots of construction companies have been realizing this method since BIM came out in China. However IPD are not considered with BIM, IPD will be an important role in management system of construction. This study introduced the definition of IPD and based on the flow process of IPD, compared the process in china and other countries. Through the real project and the condition in China this paper analyzed the feasibility of IPD in China.-
dc.language영어-
dc.language.isoen-
dc.publisher한국건설관리학회-
dc.titleA STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA-
dc.typeArticle-
dc.contributor.affiliatedAuthorKim, Jae Jun-
dc.contributor.affiliatedAuthorKim, Ju Hyung-
dc.identifier.bibliographicCitationInternational Conference on Construction Engineering and Project Management 2011, no. , pp.501 - 505-
dc.relation.isPartOfInternational Conference on Construction Engineering and Project Management 2011-
dc.citation.titleInternational Conference on Construction Engineering and Project Management 2011-
dc.citation.startPage501-
dc.citation.endPage505-
dc.type.rimsART-
dc.type.docTypeProceeding-
dc.description.journalClass3-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassother-
dc.subject.keywordAuthorIPD(integrated project delivery)-
dc.subject.keywordAuthorDesign-Building, management system-
dc.subject.keywordAuthorBIM-
dc.identifier.urlhttps://www.auric.or.kr/User/Rdoc/DocRdoc.aspx?returnVal=RD_R&dn=245548#.YhwuR-hBxPY-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Ju Hyung photo

Kim, Ju Hyung
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE