기후정보를 반영한 확률적 일정계획수립 모델 개발
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 박재현 | - |
dc.contributor.author | 김경훈 | - |
dc.contributor.author | 김재준 | - |
dc.date.accessioned | 2022-07-16T21:45:40Z | - |
dc.date.available | 2022-07-16T21:45:40Z | - |
dc.date.created | 2021-05-13 | - |
dc.date.issued | 2011-02 | - |
dc.identifier.issn | 1226-9107 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/169059 | - |
dc.description.abstract | This study aims to overcome problems of scheduling established by planner’s institution and judgment. By introducing stochastic approach, this study proposes a method to predict work duration on the construction sites reflecting work information generated around unit work of previous cases and non-working day, and this model was verified by its application to a case study. As a result of analyses on previous researches in an attempt to develop work duration model, there were several studies on estimating work duration based on stochastic approach. However, previous researches could not predict work duration in different construction sites because unit work was not separated. Accordingly, this study attempts to suggest a practical method to predict work duration in advance in pre-construction phase where construction is not under way. After predicting construction time of a site where duration is supposed to be predicted based on the data of measuring case study, verification of this model was carried out in compared to real construction time. In consequence, work duration within twelve days was been estimated with a margin of error of 5%. In addition, the period for actual construction turned out ten days, which was analyzed within twelve day. Therefore, model of this study show the practical method estimating work duration in pre-construction phase. | - |
dc.language | 한국어 | - |
dc.language.iso | ko | - |
dc.publisher | 대한건축학회 | - |
dc.title | 기후정보를 반영한 확률적 일정계획수립 모델 개발 | - |
dc.title.alternative | Development for Using Stochastic Construction Scheduling Model considering Weather Elements | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | 김재준 | - |
dc.identifier.bibliographicCitation | 대한건축학회논문집 구조계, v.27, no.2, pp.97 - 104 | - |
dc.relation.isPartOf | 대한건축학회논문집 구조계 | - |
dc.citation.title | 대한건축학회논문집 구조계 | - |
dc.citation.volume | 27 | - |
dc.citation.number | 2 | - |
dc.citation.startPage | 97 | - |
dc.citation.endPage | 104 | - |
dc.type.rims | ART | - |
dc.identifier.kciid | ART001530764 | - |
dc.description.journalClass | 2 | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | kci | - |
dc.subject.keywordAuthor | Weather Elements | - |
dc.subject.keywordAuthor | Monte Carlo Simulation | - |
dc.subject.keywordAuthor | Scheduling | - |
dc.subject.keywordAuthor | Decision Tree Analysis | - |
dc.subject.keywordAuthor | Steel Construction | - |
dc.subject.keywordAuthor | 기후정보 | - |
dc.subject.keywordAuthor | 몬테카를로 시뮬레이션 | - |
dc.subject.keywordAuthor | 일정계획 | - |
dc.subject.keywordAuthor | 결정계도 분석 | - |
dc.subject.keywordAuthor | 철골공사 | - |
dc.identifier.url | https://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE01599124 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1365
COPYRIGHT © 2021 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.