Cited 0 time in
고층건물 시공자동화를 위한 실시간진도관리 시스템 모델 제안
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 정덕기 | - |
| dc.contributor.author | 박정로 | - |
| dc.contributor.author | 김경환 | - |
| dc.contributor.author | 김재준 | - |
| dc.date.accessioned | 2022-07-16T22:10:09Z | - |
| dc.date.available | 2022-07-16T22:10:09Z | - |
| dc.date.created | 2021-05-13 | - |
| dc.date.issued | 2011-01 | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/169159 | - |
| dc.description.abstract | 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible model of real time progress management for Automated Construction. In order to conduct this study, we build a high-rise building model of a businessresidential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model. | - |
| dc.language | 한국어 | - |
| dc.language.iso | ko | - |
| dc.publisher | 한국CDE학회 | - |
| dc.title | 고층건물 시공자동화를 위한 실시간진도관리 시스템 모델 제안 | - |
| dc.title.alternative | A Study on the Model of Real Time Progress Management for Automated Construction | - |
| dc.type | Article | - |
| dc.contributor.affiliatedAuthor | 김재준 | - |
| dc.identifier.bibliographicCitation | 2011 한국 CAD/CAM 학회 학술발표회 논문집, no. , pp.1159 - | - |
| dc.relation.isPartOf | 2011 한국 CAD/CAM 학회 학술발표회 논문집 | - |
| dc.citation.title | 2011 한국 CAD/CAM 학회 학술발표회 논문집 | - |
| dc.citation.startPage | 1159 | - |
| dc.type.rims | ART | - |
| dc.type.docType | Proceeding | - |
| dc.description.journalClass | 3 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | other | - |
| dc.subject.keywordAuthor | Real Time Progress System | - |
| dc.subject.keywordAuthor | Construction Automation | - |
| dc.subject.keywordAuthor | 4D simulation | - |
| dc.identifier.url | https://www.materic.or.kr/info/scholar/content.asp?s_code=CA&p_id=111670 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
