Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Forecasting Repair Schedule for Building Components Based on Case-Based Reasoning and Fuzzy-AHP

Full metadata record
DC Field Value Language
dc.contributor.authorPark, Sojin-
dc.contributor.authorKwon, Nahyun-
dc.contributor.authorAhn, Yonghan-
dc.date.accessioned2022-08-08T05:32:26Z-
dc.date.available2022-08-08T05:32:26Z-
dc.date.created2020-12-14-
dc.date.issued2019-12-
dc.identifier.issn2071-1050-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/170448-
dc.description.abstractBuilding maintenance is closely related to the performance and sustainability of buildings. However, existing approaches to maintenance are limited in terms of estimating required repairs. Therefore, this study proposes a case-based reasoning (CBR)-based model for estimating the time when the first repair will be needed after the completion of construction, even in phases where maintenance-related information is scarce. CBR and fuzzy-analytic hierarchy process (AHP) were employed as research methodologies. A database was established by collecting 257 cases related to maintenance of apartment buildings, and attributes were extracted through literature reviews and expert interviews. Then, attributes were weighted by fuzzy-AHP and case similarities were computed by measuring the Euclidean distance. Similar cases were retrieved based on similarity scores. The model was validated via a comparison of 20 randomly selected test cases with the output of retrieved cases. The results showed that the average case similarities of 3-, 5-, 7-, and 10-nearest neighbors (NN) were 98.05%, 97.86%, 97.73%, and 97.59%, respectively, and mean absolute percentage errors for 3-, 5-, 7-, and 10-NN were mostly lower than 20%, confirming the applicability of the proposed model. The proposed method will help in the preliminary estimation of the repair time of building components.-
dc.language영어-
dc.language.isoen-
dc.publisherMDPI Open Access Publishing-
dc.titleForecasting Repair Schedule for Building Components Based on Case-Based Reasoning and Fuzzy-AHP-
dc.typeArticle-
dc.contributor.affiliatedAuthorAhn, Yonghan-
dc.identifier.doi10.3390/su11247181-
dc.identifier.scopusid2-s2.0-85079503890-
dc.identifier.wosid000506899000282-
dc.identifier.bibliographicCitationSustainability, v.11, no.24, pp.1 - 17-
dc.relation.isPartOfSustainability-
dc.citation.titleSustainability-
dc.citation.volume11-
dc.citation.number24-
dc.citation.startPage1-
dc.citation.endPage17-
dc.type.rimsART-
dc.type.docTypeArticle-
dc.description.journalClass1-
dc.description.isOpenAccessY-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassssci-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaScience & Technology - Other Topics-
dc.relation.journalResearchAreaEnvironmental Sciences & Ecology-
dc.relation.journalWebOfScienceCategoryGreen & Sustainable Science & Technology-
dc.relation.journalWebOfScienceCategoryEnvironmental Sciences-
dc.relation.journalWebOfScienceCategoryEnvironmental Studies-
dc.subject.keywordPlusDETERMINING ATTRIBUTE WEIGHTS-
dc.subject.keywordPlusCOST PREDICTION-
dc.subject.keywordPlusCBR MODEL-
dc.subject.keywordPlusMAINTENANCE-
dc.subject.keywordPlusSYSTEM-
dc.subject.keywordAuthorbuilding maintenance-
dc.subject.keywordAuthorproactive maintenance-
dc.subject.keywordAuthorapartment buildings-
dc.subject.keywordAuthorcase-based reasoning-
dc.subject.keywordAuthorfuzzy-analytic hierarchy process-
dc.identifier.urlhttps://www.mdpi.com/2071-1050/11/24/7181-
Files in This Item
Appears in
Collections
ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE