Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구

Full metadata record
DC Field Value Language
dc.contributor.author홍보배-
dc.contributor.author김주형-
dc.contributor.author김재준-
dc.contributor.author김용만-
dc.date.accessioned2022-10-25T07:48:39Z-
dc.date.available2022-10-25T07:48:39Z-
dc.date.issued2010-10-
dc.identifier.issn2288-968X-
dc.identifier.issn2288-9698-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/172638-
dc.description.abstractSuper high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.-
dc.format.extent6-
dc.language한국어-
dc.language.isoKOR-
dc.publisher한국생태환경건축학회-
dc.title초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구-
dc.title.alternativeA Study on the Productivity Analysis of Finishing Works on Super High-rise Mixed_use Building-
dc.typeArticle-
dc.publisher.location대한민국-
dc.identifier.bibliographicCitationKIEAE Journal, v.10, no.5, pp 165 - 170-
dc.citation.titleKIEAE Journal-
dc.citation.volume10-
dc.citation.number5-
dc.citation.startPage165-
dc.citation.endPage170-
dc.identifier.kciidART001491744-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClasskci-
dc.subject.keywordAuthorsuper high-rise mixed use building-
dc.subject.keywordAuthorfinishing work-
dc.subject.keywordAuthorproductivity-
dc.subject.keywordAuthor초고층 주상복합 건축물-
dc.subject.keywordAuthor마감공사-
dc.subject.keywordAuthor생산성-
dc.identifier.urlhttps://scienceon.kisti.re.kr/srch/selectPORSrchArticle.do?cn=JAKO201030360544805&SITE=CLICK-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건축공학부 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Ju Hyung photo

Kim, Ju Hyung
COLLEGE OF ENGINEERING (SCHOOL OF ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE