Cited 0 time in
Generic production planning model for remanufacturing systems
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Doh, H-H | - |
| dc.contributor.author | Lee, D-H | - |
| dc.date.accessioned | 2022-12-20T16:20:56Z | - |
| dc.date.available | 2022-12-20T16:20:56Z | - |
| dc.date.issued | 2010-08 | - |
| dc.identifier.issn | 0954-4054 | - |
| dc.identifier.issn | 2041-1975 | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/174398 | - |
| dc.description.abstract | Remanufacturing, one of the most advanced product recovery options, processes used or end-of-life products with disassembly, reprocessing, and reassembly operations in such a way that their qualities are as good as new. This paper focuses on production planning in remanufacturing systems over a given planning horizon with discrete time periods. The main decisions are: (a) the number of used or end-of-life products to be disassembled and disposed; (b) the number of parts or components to be reprocessed, disposed, and new purchased; and (c) the number of products to be reassembled. The objective is to maximize the total profit, i.e. the difference between the sales revenue and the relevant costs. In particular, set-tip costs and times are explicitly considered since set-Ups are significant in remanufacturing systems. As an extension of the existing literatures oil production planning in remanufacturing systems, a generic mixed integer programming model is suggested that incorporates the detailed processes of the remanufacturing process. Then, owing to the complexity of the problem, two types of heuristics based on the linear programming technique are developed. To show the performances of the heuristics, computational experiments were done on some test instances, and the results are reported. | - |
| dc.format.extent | 10 | - |
| dc.language | 영어 | - |
| dc.language.iso | ENG | - |
| dc.publisher | Professional Engineering Publishing Ltd. | - |
| dc.title | Generic production planning model for remanufacturing systems | - |
| dc.type | Article | - |
| dc.publisher.location | 영국 | - |
| dc.identifier.doi | 10.1243/09544054JEM1543 | - |
| dc.identifier.scopusid | 2-s2.0-76849109999 | - |
| dc.identifier.wosid | 000275649400015 | - |
| dc.identifier.bibliographicCitation | Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, v.224, no.B1, pp 159 - 168 | - |
| dc.citation.title | Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture | - |
| dc.citation.volume | 224 | - |
| dc.citation.number | B1 | - |
| dc.citation.startPage | 159 | - |
| dc.citation.endPage | 168 | - |
| dc.type.docType | Article | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | sci | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Manufacturing | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Mechanical | - |
| dc.subject.keywordPlus | RECOVERY | - |
| dc.subject.keywordPlus | STRATEGY | - |
| dc.subject.keywordAuthor | product recovery | - |
| dc.subject.keywordAuthor | remanufacturing | - |
| dc.subject.keywordAuthor | production planning | - |
| dc.subject.keywordAuthor | heuristics | - |
| dc.identifier.url | https://journals.sagepub.com/doi/10.1243/09544054JEM1543 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
