Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

다 단계 혼합흐름공정 일정계획에서 납기지연 작업 수의 최소화를 위한 대체 목적함수 기반 탐색기법

Full metadata record
DC Field Value Language
dc.contributor.author최현선-
dc.contributor.author김형원-
dc.contributor.author이동호-
dc.date.accessioned2022-12-20T19:29:18Z-
dc.date.available2022-12-20T19:29:18Z-
dc.date.issued2009-12-
dc.identifier.issn1225-0988-
dc.identifier.issn2234-6457-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/175649-
dc.description.abstractThis paper considers the hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. In hybrid flow shops, each job is processed through multiple production stages in series, each of which has multiple identical parallel machines. The problem is to determine the allocation of jobs to the parallel machines at each stage as well as the sequence of the jobs assigned to each machine. Due to the complexity of the problem, we suggest search heuristics, tabu search and simulated annealing algorithms with a new method to generate neighborhood solutions. In particular, to evaluate and select neighborhood solutions, three surrogate objectives are additionally suggested because not much difference in the number of tardy jobs can be found among the neighborhoods. To test the performances of the surrogate objective based search heuristics, computational experiments were performed on a number of test instances and the results show that the surrogate objective based search heuristics were better than the original ones. Also, they gave the optimal solutions for most small-size test instances.-
dc.format.extent9-
dc.language영어-
dc.language.isoENG-
dc.publisher대한산업공학회-
dc.title다 단계 혼합흐름공정 일정계획에서 납기지연 작업 수의 최소화를 위한 대체 목적함수 기반 탐색기법-
dc.title.alternativeSurrogate Objective based Search Heuristics to Minimize the Number of Tardy Jobs for Multi-Stage Hybrid Flow Shop Scheduling-
dc.typeArticle-
dc.publisher.location대한민국-
dc.identifier.bibliographicCitation대한산업공학회지, v.35, no.4, pp 257 - 265-
dc.citation.title대한산업공학회지-
dc.citation.volume35-
dc.citation.number4-
dc.citation.startPage257-
dc.citation.endPage265-
dc.identifier.kciidART001393360-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClasskci-
dc.subject.keywordAuthorHybrid Flow Shops-
dc.subject.keywordAuthorScheduling-
dc.subject.keywordAuthorNumber of Tardy Jobs-
dc.subject.keywordAuthorSearch Heuristics-
dc.subject.keywordAuthorSurrogate Objectives-
dc.identifier.urlhttps://scienceon.kisti.re.kr/srch/selectPORSrchArticle.do?cn=JAKO200920036084970&SITE=CLICK-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE