Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

A branch and bound algorithm for disassembly scheduling with assembly product structure

Full metadata record
DC Field Value Language
dc.contributor.authorKim, Hwa-Joong-
dc.contributor.authorLee, Dong Ho-
dc.contributor.authorXirouchakis, Paul-
dc.contributor.authorKwon, Ok-Kyuoung-
dc.date.accessioned2022-12-20T23:14:54Z-
dc.date.available2022-12-20T23:14:54Z-
dc.date.issued2009-03-
dc.identifier.issn0160-5682-
dc.identifier.issn1476-9360-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/177207-
dc.description.abstractThis paper considers a production planning problem in disassembly systems, which is the problem of determining the quantity and timing of disassembling end-of-use/life products in order to satisfy the demand of their parts or components over a planning horizon. The case of single product type without parts commonality is considered for the objective of minimizing the sum of setup and inventory holding costs. To show the complexity of the problem, we prove that the problem is NP-hard. Then, after deriving the properties of optimal solutions, a branch and bound algorithm is suggested that incorporates the Lagrangean relaxation-based upper and lower bounds. Computational experiments are performed on a number of randomly generated problems and the test results indicate that the branch and bound algorithm can give optimal solutions up to moderate-sized problems in a reasonable computation time. A Lagrangean heuristic for a viable alternative for large-sized problems is also suggested and compared with the existing heuristics to show its effectiveness.-
dc.format.extent12-
dc.language영어-
dc.language.isoENG-
dc.publisherPalgrave Macmillan Ltd.-
dc.titleA branch and bound algorithm for disassembly scheduling with assembly product structure-
dc.typeArticle-
dc.publisher.location영국-
dc.identifier.doi10.1057/palgrave.jors.2602568-
dc.identifier.scopusid2-s2.0-60749122690-
dc.identifier.wosid000263721000012-
dc.identifier.bibliographicCitationJournal of the Operational Research Society, v.60, no.3, pp 419 - 430-
dc.citation.titleJournal of the Operational Research Society-
dc.citation.volume60-
dc.citation.number3-
dc.citation.startPage419-
dc.citation.endPage430-
dc.type.docTypeArticle-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaBusiness & Economics-
dc.relation.journalResearchAreaOperations Research & Management Science-
dc.relation.journalWebOfScienceCategoryManagement-
dc.relation.journalWebOfScienceCategoryOperations Research & Management Science-
dc.subject.keywordPlusPARTS-
dc.subject.keywordAuthorenvironmental studies-
dc.subject.keywordAuthorproduction and scheduling-
dc.subject.keywordAuthoroptimal algorithm-
dc.identifier.urlhttps://www.tandfonline.com/doi/full/10.1057/palgrave.jors.2602568-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE