Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops

Full metadata record
DC Field Value Language
dc.contributor.authorChoi, Hyun-Seon-
dc.contributor.authorLee, Dong-Ho-
dc.date.accessioned2022-12-20T23:41:19Z-
dc.date.available2022-12-20T23:41:19Z-
dc.date.issued2009-02-
dc.identifier.issn0360-8352-
dc.identifier.issn1879-0550-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/177344-
dc.description.abstractThis paper considers a two-stage hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. Each job is processed through the two production stages in series, each of which has multiple identical parallel machines. The problem is to determine the allocation of jobs to the parallel machines as well as the sequence of the jobs assigned to each machine. To solve the problem, a branch and bound algorithm, which incorporates the methods to obtain the lower and upper bounds as well as the dominance properties to reduce the search space, is suggested that gives the optimal solutions. In addition, two-phase heuristic algorithms are suggested to obtain good solutions for large-size problems within a reasonable amount of computation time. To show the performances of the optimal and heuristic algorithms suggested in this paper, computational experiments are done on a number of randomly generated test problems, and the test results are reported.-
dc.format.extent8-
dc.language영어-
dc.language.isoENG-
dc.publisherPergamon Press Ltd.-
dc.titleScheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops-
dc.typeArticle-
dc.publisher.location영국-
dc.identifier.doi10.1016/j.cie.2008.04.005-
dc.identifier.scopusid2-s2.0-59049095231-
dc.identifier.wosid000262599000014-
dc.identifier.bibliographicCitationComputers and Industrial Engineering, v.56, no.1, pp 113 - 120-
dc.citation.titleComputers and Industrial Engineering-
dc.citation.volume56-
dc.citation.number1-
dc.citation.startPage113-
dc.citation.endPage120-
dc.type.docTypeArticle-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaComputer Science-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryComputer Science, Interdisciplinary Applications-
dc.relation.journalWebOfScienceCategoryEngineering, Industrial-
dc.subject.keywordPlusBOUND ALGORITHM-
dc.subject.keywordPlusPARALLEL MACHINES-
dc.subject.keywordPlusTARDINESS-
dc.subject.keywordPlusBRANCH-
dc.subject.keywordPlusFLOWSHOPS-
dc.subject.keywordPlusTIME-
dc.subject.keywordAuthorScheduling-
dc.subject.keywordAuthorTwo-stage hybrid flow shop-
dc.subject.keywordAuthorNumber of tardy jobs-
dc.subject.keywordAuthorBranch and bound-
dc.subject.keywordAuthorHeuristics-
dc.identifier.urlhttps://www.sciencedirect.com/science/article/pii/S0360835208000831?via%3Dihub-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE