Cited 0 time in
Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Choi, Hyun-Seon | - |
| dc.contributor.author | Lee, Dong-Ho | - |
| dc.date.accessioned | 2022-12-20T23:41:19Z | - |
| dc.date.available | 2022-12-20T23:41:19Z | - |
| dc.date.issued | 2009-02 | - |
| dc.identifier.issn | 0360-8352 | - |
| dc.identifier.issn | 1879-0550 | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/177344 | - |
| dc.description.abstract | This paper considers a two-stage hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. Each job is processed through the two production stages in series, each of which has multiple identical parallel machines. The problem is to determine the allocation of jobs to the parallel machines as well as the sequence of the jobs assigned to each machine. To solve the problem, a branch and bound algorithm, which incorporates the methods to obtain the lower and upper bounds as well as the dominance properties to reduce the search space, is suggested that gives the optimal solutions. In addition, two-phase heuristic algorithms are suggested to obtain good solutions for large-size problems within a reasonable amount of computation time. To show the performances of the optimal and heuristic algorithms suggested in this paper, computational experiments are done on a number of randomly generated test problems, and the test results are reported. | - |
| dc.format.extent | 8 | - |
| dc.language | 영어 | - |
| dc.language.iso | ENG | - |
| dc.publisher | Pergamon Press Ltd. | - |
| dc.title | Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops | - |
| dc.type | Article | - |
| dc.publisher.location | 영국 | - |
| dc.identifier.doi | 10.1016/j.cie.2008.04.005 | - |
| dc.identifier.scopusid | 2-s2.0-59049095231 | - |
| dc.identifier.wosid | 000262599000014 | - |
| dc.identifier.bibliographicCitation | Computers and Industrial Engineering, v.56, no.1, pp 113 - 120 | - |
| dc.citation.title | Computers and Industrial Engineering | - |
| dc.citation.volume | 56 | - |
| dc.citation.number | 1 | - |
| dc.citation.startPage | 113 | - |
| dc.citation.endPage | 120 | - |
| dc.type.docType | Article | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | scie | - |
| dc.description.journalRegisteredClass | scopus | - |
| dc.relation.journalResearchArea | Computer Science | - |
| dc.relation.journalResearchArea | Engineering | - |
| dc.relation.journalWebOfScienceCategory | Computer Science, Interdisciplinary Applications | - |
| dc.relation.journalWebOfScienceCategory | Engineering, Industrial | - |
| dc.subject.keywordPlus | BOUND ALGORITHM | - |
| dc.subject.keywordPlus | PARALLEL MACHINES | - |
| dc.subject.keywordPlus | TARDINESS | - |
| dc.subject.keywordPlus | BRANCH | - |
| dc.subject.keywordPlus | FLOWSHOPS | - |
| dc.subject.keywordPlus | TIME | - |
| dc.subject.keywordAuthor | Scheduling | - |
| dc.subject.keywordAuthor | Two-stage hybrid flow shop | - |
| dc.subject.keywordAuthor | Number of tardy jobs | - |
| dc.subject.keywordAuthor | Branch and bound | - |
| dc.subject.keywordAuthor | Heuristics | - |
| dc.identifier.url | https://www.sciencedirect.com/science/article/pii/S0360835208000831?via%3Dihub | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
