Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Scheduling algorithms for parallel machines with sequence-dependent set-up and distinct ready times: minimizing total tardiness

Full metadata record
DC Field Value Language
dc.contributor.authorKim, Sang-Il-
dc.contributor.authorChoi, Hyun-Seon-
dc.contributor.authorLee, Dong-Ho-
dc.date.accessioned2022-12-21T08:09:14Z-
dc.date.available2022-12-21T08:09:14Z-
dc.date.created2022-08-26-
dc.date.issued2007-06-
dc.identifier.issn0954-4054-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/180077-
dc.description.abstractThis paper considers the problem of determining the allocation and sequence of jobs on parallel machines for the objective of minimizing total tardiness. Each job may have a sequence-dependent set-up time that depends on the type of job just completed and on the job to be processed as well as distinct ready times at which the job is available for processing. These make the parallel machine scheduling problem more difficult than ordinary ones. Due to the complexity of the problem, two types of search heuristic, tabu search, and simulated annealing are suggested that incorporate new methods to generate the neighbourhood solutions. Three methods of obtaining the initial solutions are also suggested. Computational experiments are done on a number of randomly generated test problems, and the results show that some of the search heuristics suggested in this paper outperform the existing ones.-
dc.language영어-
dc.language.isoen-
dc.publisherSAGE PUBLICATIONS LTD-
dc.titleScheduling algorithms for parallel machines with sequence-dependent set-up and distinct ready times: minimizing total tardiness-
dc.typeArticle-
dc.contributor.affiliatedAuthorLee, Dong-Ho-
dc.identifier.doi10.1243/09544054JEM779-
dc.identifier.scopusid2-s2.0-34748833472-
dc.identifier.wosid000248632000015-
dc.identifier.bibliographicCitationPROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, v.221, no.6, pp.1087 - 1096-
dc.relation.isPartOfPROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE-
dc.citation.titlePROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE-
dc.citation.volume221-
dc.citation.number6-
dc.citation.startPage1087-
dc.citation.endPage1096-
dc.type.rimsART-
dc.type.docTypeArticle-
dc.description.journalClass1-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryEngineering, Manufacturing-
dc.relation.journalWebOfScienceCategoryEngineering, Mechanical-
dc.subject.keywordPlusHEURISTICS-
dc.subject.keywordPlusJOBS-
dc.subject.keywordAuthorparallel machine scheduling-
dc.subject.keywordAuthorsequence-dependent set-up times-
dc.subject.keywordAuthordistinct ready times-
dc.subject.keywordAuthorsearch heuristics-
dc.identifier.urlhttps://journals.sagepub.com/doi/10.1243/09544054JEM779-
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 산업공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Lee, Dong Ho photo

Lee, Dong Ho
COLLEGE OF ENGINEERING (DEPARTMENT OF INDUSTRIAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE