Cited 0 time in
해체 공사의 BIM-3D Scanning 적용 사례를 통한 폐기물량 산정 및 해체 BIM (BIMfD) 효과 분석
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | 김반석 | - |
| dc.contributor.author | 안이슬 | - |
| dc.contributor.author | 이윤구 | - |
| dc.contributor.author | 김재준 | - |
| dc.date.accessioned | 2024-12-20T06:00:13Z | - |
| dc.date.available | 2024-12-20T06:00:13Z | - |
| dc.date.issued | 2024-12 | - |
| dc.identifier.issn | 2508-4003 | - |
| dc.identifier.issn | 2508-402X | - |
| dc.identifier.uri | https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/202248 | - |
| dc.description.abstract | This study analyzed the deconstruction legislation and 11 existing deconstruction projects to derive the required information system and delay factors. To address these identified factors, a framework for introducing 3D scanning and BIM into deconstruction was proposed. The pro- posed framework comprises equipment selection, simulation methodology, and quantity estima- tion based on BIM material parameters. The results of the case application of the framework showed that it is effective in supporting decision-making through visualization and safety moni- toring according to equipment movement. In addition, the process of calculating the actual weight and volume change rate of waste by utilizing the physical properties of the materials as BIM parameters can provide the information required for deconstruction. | - |
| dc.format.extent | 19 | - |
| dc.language | 한국어 | - |
| dc.language.iso | KOR | - |
| dc.publisher | 한국CDE학회 | - |
| dc.title | 해체 공사의 BIM-3D Scanning 적용 사례를 통한 폐기물량 산정 및 해체 BIM (BIMfD) 효과 분석 | - |
| dc.title.alternative | Waste Estimation and Analysis of BIM for Deconstruction (BIMfD) Effectiveness Through Application of BIM-3D Scanning for Deconstruction Project | - |
| dc.type | Article | - |
| dc.publisher.location | 대한민국 | - |
| dc.identifier.doi | 10.7315/CDE.2024.381 | - |
| dc.identifier.bibliographicCitation | 한국CDE학회 논문집, v.29, no.4, pp 381 - 399 | - |
| dc.citation.title | 한국CDE학회 논문집 | - |
| dc.citation.volume | 29 | - |
| dc.citation.number | 4 | - |
| dc.citation.startPage | 381 | - |
| dc.citation.endPage | 399 | - |
| dc.identifier.kciid | ART003141967 | - |
| dc.description.isOpenAccess | N | - |
| dc.description.journalRegisteredClass | kci | - |
| dc.subject.keywordAuthor | 3D Scanning | - |
| dc.subject.keywordAuthor | BIM | - |
| dc.subject.keywordAuthor | Case study | - |
| dc.subject.keywordAuthor | Deconstruction | - |
| dc.identifier.url | https://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE11994199&language=ko_KR&hasTopBanner=true | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
222, Wangsimni-ro, Seongdong-gu, Seoul, 04763, Korea+82-2-2220-1366
COPYRIGHT © 2024 HANYANG UNIVERSITY.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.
