Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Tunnels Construction Planning and Suggestions to Speed up Tunnel Excavation Progress

Authors
Jo, Byung WanR.M.AsadZafar, BalochSikandar, M.A.Kim, Heon
Issue Date
Oct-2014
Publisher
대한토목학회
Keywords
Tunnels; Excavationcycle; rockquality; planning; suggestions; progress
Citation
2014 대한토목학회 정기학술대회, pp 591 - 592
Pages
2
Indexed
OTHER
Journal Title
2014 대한토목학회 정기학술대회
Start Page
591
End Page
592
URI
https://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/202633
Abstract
Main aim of this study is to explain some suggestions which can be adopt during tunnels constructionby drill and blast. These suggestions are supportive to increase tunnel construction progress. Thesesuggestions basically reduce tunnel excavation cycle by skipping temporarily some activities. Skippedactivities can be carries out later on by combining for two to three cycles. All of these suggestions aredependent upon rock class, water inflow rate and rock stand up time. At one hydro power project thesesuggestions were practically applied to tunnels construction and reduction in time cycle time was morethan 4 hours.
Files in This Item
Go to Link
Appears in
Collections
서울 공과대학 > 서울 건설환경공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE