Detailed Information

Cited 3 time in webofscience Cited 5 time in scopus
Metadata Downloads

VIRTUAL GRAPHIC REPRESENTATION OF CONSTRUCTION EQUIPMENT FOR DEVELOPING A 3D EARTHWORK BIM

Full metadata record
DC Field Value Language
dc.contributor.authorMoon, Sungwoo-
dc.contributor.authorSeo, Jongwon-
dc.date.accessioned2021-07-30T05:11:55Z-
dc.date.available2021-07-30T05:11:55Z-
dc.date.issued2017-11-
dc.identifier.issn1392-3730-
dc.identifier.issn1822-3605-
dc.identifier.urihttps://scholarworks.bwise.kr/hanyang/handle/2021.sw.hanyang/3459-
dc.description.abstractBIM provides a visualization of the construction design that allows a construction manager to review the construction process and the information that is associated with the progress. BIM is usually applied to modeling structural objects with parametric geometry where the sequence of process can be predefined. However, BIM technology can also be applied to objects with irregular shape where parametric modeling is not possible such as earthwork topography based on TIN (Triangular Irregular Network).The objective of this research is to develop a 3D earthwork BIM methodology and provide a graphic simulation that is capable of assisting construction equipment operators during excavation work. The 3D earthwork BIM presents a modeling technique that involves integrating hardware and software technologies. This combination of technologies is used to represent the actual excavator configuration in a 3D virtual environment. When it is applied to actual excavation work, it was proved that the 3D earthwork BIM could synchronize the virtual excavator configuration with the actual excavator configuration during excavation work in real time.-
dc.format.extent8-
dc.language영어-
dc.language.isoENG-
dc.publisherVilnius Gediminas Technical University-
dc.titleVIRTUAL GRAPHIC REPRESENTATION OF CONSTRUCTION EQUIPMENT FOR DEVELOPING A 3D EARTHWORK BIM-
dc.typeArticle-
dc.publisher.location리투아니아-
dc.identifier.doi10.3846/13923730.2017.1348981-
dc.identifier.scopusid2-s2.0-85038841556-
dc.identifier.wosid000419971800001-
dc.identifier.bibliographicCitationJournal of Civil Engineering and Management, v.23, no.8, pp 977 - 984-
dc.citation.titleJournal of Civil Engineering and Management-
dc.citation.volume23-
dc.citation.number8-
dc.citation.startPage977-
dc.citation.endPage984-
dc.type.docTypeArticle-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.subject.keywordAuthorBIM-
dc.subject.keywordAuthorearthwork operation-
dc.subject.keywordAuthorconstruction equipment-
dc.subject.keywordAuthorgeographical modeling-
dc.subject.keywordAuthorexcavator-
dc.subject.keywordAuthorgraphic simulation-
dc.identifier.urlhttps://journals.vgtu.lt/index.php/JCEM/article/view/1246-
Files in This Item
Appears in
Collections
서울 공과대학 > 서울 건설환경공학과 > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Seo, Jong won photo

Seo, Jong won
COLLEGE OF ENGINEERING (DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE