Development of a Stochastic Simulation Model for Estimating Construction Time Durations
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Choi, Jaehyun | - |
dc.contributor.author | Son, Jaeho | - |
dc.contributor.author | Lee, Seunghyun | - |
dc.date.accessioned | 2021-12-15T02:42:45Z | - |
dc.date.available | 2021-12-15T02:42:45Z | - |
dc.date.created | 2021-12-10 | - |
dc.date.issued | 2011-07 | - |
dc.identifier.issn | 1343-4500 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/19858 | - |
dc.description.abstract | High level of uncertainty is one of the most distinct characteristics of construction operations. This is especially true when it comes to estimating construction operation durations because the operations are performed in the field where unpredictable site conditions may influence production. In order to expedite the modeling, analysis, and optimization of a construction operation, computer simulation has been utilized in construction with the help of computer information technology. Due to the nature of computer simulation, most simulation methods have difficulty responding to delays and interruptions once the simulation begins. The researchers developed an alternative method to categorize and quantify interference factors. Four case study projects were selected to estimate the productivity with respond to the interference factors. The research results showed that applying interference factors to the productivity estimation improved its accuracy significantly. The researchers suggest that the durations of construction operation be estimated by utilizing computer simulation methods that are capable of reflecting construction delays and interference. | - |
dc.language | 영어 | - |
dc.language.iso | en | - |
dc.publisher | INT INFORMATION INST | - |
dc.subject | PETRI NETS | - |
dc.subject | SYSTEMS | - |
dc.title | Development of a Stochastic Simulation Model for Estimating Construction Time Durations | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Son, Jaeho | - |
dc.contributor.affiliatedAuthor | Lee, Seunghyun | - |
dc.identifier.scopusid | 2-s2.0-84860134361 | - |
dc.identifier.wosid | 000295904700003 | - |
dc.identifier.bibliographicCitation | INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, v.14, no.7, pp.2207 - 2218 | - |
dc.relation.isPartOf | INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL | - |
dc.citation.title | INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL | - |
dc.citation.volume | 14 | - |
dc.citation.number | 7 | - |
dc.citation.startPage | 2207 | - |
dc.citation.endPage | 2218 | - |
dc.type.rims | ART | - |
dc.type.docType | Article | - |
dc.description.journalClass | 1 | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Engineering, Multidisciplinary | - |
dc.subject.keywordPlus | PETRI NETS | - |
dc.subject.keywordPlus | SYSTEMS | - |
dc.subject.keywordAuthor | Process Simulation | - |
dc.subject.keywordAuthor | Petri-Net Simulation | - |
dc.subject.keywordAuthor | Construction Productivity | - |
dc.subject.keywordAuthor | Construction Time Duration | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
94, Wausan-ro, Mapo-gu, Seoul, 04066, Korea02-320-1314
COPYRIGHT 2020 HONGIK UNIVERSITY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.