An alternative stochastic simulation model for estimating construction time durations
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Choi, J. | - |
dc.contributor.author | Minchin, E.R. | - |
dc.contributor.author | Lee, S. | - |
dc.date.accessioned | 2021-12-17T04:42:14Z | - |
dc.date.available | 2021-12-17T04:42:14Z | - |
dc.date.created | 2021-12-16 | - |
dc.date.issued | 2010 | - |
dc.identifier.issn | 0000-0000 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/21652 | - |
dc.description.abstract | High level of uncertainty is one of the most distinct characteristics of construction operations. This is especially true when it comes to estimating construction operation durations because the operations are performed in the field where unpredictable site conditions may influence production. In order to expedite the modeling, analysis, and optimization of a construction operation, computer simulation has been utilized in construction with the help of computer information technology. Due to the nature of computer simulation, most simulation methods have difficulty responding to delays and interruptions once the simulation begins. The researchers suggest that the durations of construction operation be estimated by utilizing computer simulation methods that are capable of reflecting construction delays and interference. The research results showed that applying interference factors to the productivity estimation improved its accuracy. ©2010 IEEE. | - |
dc.language | 영어 | - |
dc.language.iso | en | - |
dc.title | An alternative stochastic simulation model for estimating construction time durations | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Lee, S. | - |
dc.identifier.doi | 10.1109/ICUT.2010.5677792 | - |
dc.identifier.scopusid | 2-s2.0-78751690199 | - |
dc.identifier.bibliographicCitation | 2010 Proceedings of the 5th International Conference on Ubiquitous Information Technologies and Applications, CUTE 2010 | - |
dc.relation.isPartOf | 2010 Proceedings of the 5th International Conference on Ubiquitous Information Technologies and Applications, CUTE 2010 | - |
dc.citation.title | 2010 Proceedings of the 5th International Conference on Ubiquitous Information Technologies and Applications, CUTE 2010 | - |
dc.type.rims | ART | - |
dc.type.docType | Conference Paper | - |
dc.description.journalClass | 1 | - |
dc.description.journalRegisteredClass | scopus | - |
dc.subject.keywordAuthor | Construction productivity | - |
dc.subject.keywordAuthor | Construction time duration | - |
dc.subject.keywordAuthor | Petri-net simulation | - |
dc.subject.keywordAuthor | Process simulation | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
94, Wausan-ro, Mapo-gu, Seoul, 04066, Korea02-320-1314
COPYRIGHT 2020 HONGIK UNIVERSITY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.