Nonlinear cash flow optimization model
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Son, Jaeho | - |
dc.contributor.author | Mack, Martin | - |
dc.contributor.author | Mattila, Kris G. | - |
dc.date.accessioned | 2022-02-07T05:41:01Z | - |
dc.date.available | 2022-02-07T05:41:01Z | - |
dc.date.created | 2022-02-07 | - |
dc.date.issued | 2006-11 | - |
dc.identifier.issn | 0315-1468 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/hongik/handle/2020.sw.hongik/24498 | - |
dc.description.abstract | During construction, progress payments (cash inflow) are made periodically to contractors based oil work performed. Contractors are required to pay the direct costs (cash outflow) during construction. The net difference between the cash inflow and outflow is the overdraft, which contractors must finance either from the bank or from their own resources. To increase profit margin, contractors consider methods to improve their cash flow, which will increase profit. These methods include front end loading (Stark 1974) and shifting of activities (Easa 1992). These two linear procedures could be done sequentially. However, this sequential linear formulation may not produce an optimized solution because of the nonlinear characteristics of the model. This note examines the combination of the two linear procedures into a single nonlinear formulation Such that better profit margin call be achieved. | - |
dc.language | 영어 | - |
dc.language.iso | en | - |
dc.publisher | CANADIAN SCIENCE PUBLISHING, NRC RESEARCH PRESS | - |
dc.subject | CONSTRUCTION | - |
dc.title | Nonlinear cash flow optimization model | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Son, Jaeho | - |
dc.identifier.doi | 10.1139/L06-086 | - |
dc.identifier.scopusid | 2-s2.0-34047114837 | - |
dc.identifier.wosid | 000244647600012 | - |
dc.identifier.bibliographicCitation | CANADIAN JOURNAL OF CIVIL ENGINEERING, v.33, no.11, pp.1450 - 1454 | - |
dc.relation.isPartOf | CANADIAN JOURNAL OF CIVIL ENGINEERING | - |
dc.citation.title | CANADIAN JOURNAL OF CIVIL ENGINEERING | - |
dc.citation.volume | 33 | - |
dc.citation.number | 11 | - |
dc.citation.startPage | 1450 | - |
dc.citation.endPage | 1454 | - |
dc.type.rims | ART | - |
dc.type.docType | Article | - |
dc.description.journalClass | 1 | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
dc.subject.keywordPlus | CONSTRUCTION | - |
dc.subject.keywordAuthor | cost analysis | - |
dc.subject.keywordAuthor | optimization | - |
dc.subject.keywordAuthor | linear programming | - |
dc.subject.keywordAuthor | nonlinear programming | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
94, Wausan-ro, Mapo-gu, Seoul, 04066, Korea02-320-1314
COPYRIGHT 2020 HONGIK UNIVERSITY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.