초고층 건축물의 건물 커미셔닝 프로세스 적용 및 시스템 개선방안 제안
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 김효준 | - |
dc.contributor.author | 조영흠 | - |
dc.contributor.author | 류성용 | - |
dc.contributor.author | 조현 | - |
dc.date.available | 2020-04-24T11:25:28Z | - |
dc.date.created | 2020-03-31 | - |
dc.date.issued | 2017 | - |
dc.identifier.issn | 1976-6483 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/kumoh/handle/2020.sw.kumoh/1148 | - |
dc.description.abstract | The purpose of this study is to show the application of building commissioning process for high-rise building in Korea. Building commissioning is an method to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. The case study building is a 68-story office and hotel with total floor area of 195,324 square meter. An energy audit was conducted to evaluate the indoor comfort and building energy performance. Specific building commissioning process were applied in the building. This study presents procedures, implementations and detailed descriptions of control sequence and operation comparisons for the terminal units and air handling units (AHUs), as well as the chilled water system. The study result shows 20% of energy cost saving. | - |
dc.language | 한국어 | - |
dc.language.iso | ko | - |
dc.publisher | 한국건축친환경설비학회 | - |
dc.title | 초고층 건축물의 건물 커미셔닝 프로세스 적용 및 시스템 개선방안 제안 | - |
dc.title.alternative | Proposal of Energy System Improvements through Building Commissioning Process of High-rise Building | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | 류성용 | - |
dc.identifier.bibliographicCitation | 한국건축친환경설비학회 논문집, v.11, no.2, pp.100 - 106 | - |
dc.citation.title | 한국건축친환경설비학회 논문집 | - |
dc.citation.volume | 11 | - |
dc.citation.number | 2 | - |
dc.citation.startPage | 100 | - |
dc.citation.endPage | 106 | - |
dc.type.rims | ART | - |
dc.identifier.kciid | ART002218018 | - |
dc.description.journalClass | 2 | - |
dc.subject.keywordAuthor | Building commissioning | - |
dc.subject.keywordAuthor | Energy savings | - |
dc.subject.keywordAuthor | High-rise Building | - |
dc.subject.keywordAuthor | Improvement | - |
dc.subject.keywordAuthor | 건물 커미셔닝 | - |
dc.subject.keywordAuthor | 에너지 절감 | - |
dc.subject.keywordAuthor | 초고층 건축물 | - |
dc.subject.keywordAuthor | 개선방안 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
350-27, Gumi-daero, Gumi-si, Gyeongsangbuk-do, Republic of Korea (39253)054-478-7170
COPYRIGHT 2020 Kumoh University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.