Scheduling multi-mode resource-constrained projects using heuristic rules under uncertainty environment
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Abdel-Basset, Mohamed | - |
dc.contributor.author | Sleem, Ahmed | - |
dc.contributor.author | Atef, Asmaa | - |
dc.contributor.author | Nam, Yunyoung | - |
dc.contributor.author | Abouhawwash, Mohamed | - |
dc.date.accessioned | 2021-10-05T04:43:50Z | - |
dc.date.available | 2021-10-05T04:43:50Z | - |
dc.date.created | 2021-09-24 | - |
dc.date.issued | 2021-01-01 | - |
dc.identifier.issn | 1546-2218 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/sch/handle/2021.sw.sch/19909 | - |
dc.description.abstract | Project scheduling is a key objective of many models and is the proposed method for project planning and management. Project scheduling problems depend on precedence relationships and resource constraints, in addition to some other limitations for achieving a subset of goals. Project scheduling problems are dependent on many limitations, including limitations of precedence relationships, resource constraints, and some other limitations for achieving a subset of goals. Deterministic project scheduling models consider all information about the scheduling problem such as activity durations and precedence relationships information resources available and required, which are known and stable during the implementation process. The concept of deterministic project scheduling conflicts with real situations, in which in many cases, some data on the activity' s durations of the project and the degree of availability of resources change or may have different modes and strategies during the process of project implementation for dealing with multi-mode conditions surrounded by projects and their activity durations. Scheduling the multi-mode resource-constrained project problem is an optimization problem whose minimum project duration subject to the availability of resources is of particular interest to us. We use the multi-mode resource allocation and scheduling model that takes into account the dynamicity features of all parameters, that is, the scheduling process must be flexible to dynamic environment features. In this paper, we propose five priority heuristic rules for scheduling multi-mode resource-constrained projects under dynamicity features for more realistic situations, in which we apply the proposed heuristic rules (PHR) for scheduling multi-mode resource-constrained projects. Five projects are considered test problems for the PHR. The obtained results rendered by these priority rules for the test problems are compared by the results obtained from 10 well-known heuristics rules rendered for the same test problems. The results in many cases of the proposed priority rules are very promising, where they achieve better scheduling dates in many test case problems and the same results for the others. The proposed model is based on the dynamic features for project topography. | - |
dc.publisher | Tech Science Press | - |
dc.title | Scheduling multi-mode resource-constrained projects using heuristic rules under uncertainty environment | - |
dc.type | Article | - |
dc.contributor.affiliatedAuthor | Nam, Yunyoung | - |
dc.identifier.doi | 10.32604/cmc.2022.017106 | - |
dc.identifier.scopusid | 2-s2.0-85114555625 | - |
dc.identifier.wosid | 000696956000008 | - |
dc.identifier.bibliographicCitation | Computers, Materials and Continua, v.70, no.1, pp.847 - 874 | - |
dc.relation.isPartOf | Computers, Materials and Continua | - |
dc.citation.title | Computers, Materials and Continua | - |
dc.citation.volume | 70 | - |
dc.citation.number | 1 | - |
dc.citation.startPage | 847 | - |
dc.citation.endPage | 874 | - |
dc.type.rims | ART | - |
dc.type.docType | Article | - |
dc.description.journalClass | 1 | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Computer Science | - |
dc.relation.journalResearchArea | Materials Science | - |
dc.relation.journalWebOfScienceCategory | Computer Science, Information Systems | - |
dc.relation.journalWebOfScienceCategory | Materials Science, Multidisciplinary | - |
dc.subject.keywordAuthor | Constrained resource scheduling | - |
dc.subject.keywordAuthor | multi-mode durations | - |
dc.subject.keywordAuthor | dynamic scheduling | - |
dc.subject.keywordAuthor | resource allocation | - |
dc.subject.keywordAuthor | heuristic rules | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
(31538) 22, Soonchunhyang-ro, Asan-si, Chungcheongnam-do, Republic of Korea+82-41-530-1114
COPYRIGHT 2021 by SOONCHUNHYANG UNIVERSITY ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.