Maintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Heo, Jae-Haeng | - |
dc.contributor.author | Kim, Mun-Kyeom | - |
dc.contributor.author | Kim, Dam | - |
dc.contributor.author | Lyu, Jae-Kun | - |
dc.contributor.author | Kang, Yong-Cheol | - |
dc.contributor.author | Park, Jong-Keun | - |
dc.date.available | 2019-03-08T21:40:41Z | - |
dc.date.issued | 2014-07 | - |
dc.identifier.issn | 1975-0102 | - |
dc.identifier.issn | 2093-7423 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/12076 | - |
dc.description.abstract | Overhead transmission lines are crucial components in power transmission systems. Well-designed maintenance strategy for overhead lines is required for power utilities to minimize operating costs, while improving the reliability of the power system. This paper presents a maintenance priority index (MPI) of overhead lines for a reliability centered approach. Proposed maintenance strategy is composed of a state index and importance indices, taking into account a transmission condition and importance in system reliability, respectively. The state index is used to determine the condition of overhead lines. On the other hand, the proposed importance indices indicate their criticality analysis in transmission system, by using a load effect index (LEI) and failure effect index (FEI). The proposed maintenance method using the MPI has been tested on an IEEE 9-bus system, and a numerical result demonstrates that our strategy is more cost effective than traditional maintenance strategies. | - |
dc.format.extent | 10 | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | KOREAN INST ELECTR ENG | - |
dc.title | Maintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach | - |
dc.type | Article | - |
dc.identifier.doi | 10.5370/JEET.2014.9.4.1248 | - |
dc.identifier.bibliographicCitation | JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, v.9, no.4, pp 1248 - 1257 | - |
dc.identifier.kciid | ART001892407 | - |
dc.description.isOpenAccess | N | - |
dc.identifier.wosid | 000338483900014 | - |
dc.identifier.scopusid | 2-s2.0-84904294917 | - |
dc.citation.endPage | 1257 | - |
dc.citation.number | 4 | - |
dc.citation.startPage | 1248 | - |
dc.citation.title | JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY | - |
dc.citation.volume | 9 | - |
dc.type.docType | Article | - |
dc.publisher.location | 대한민국 | - |
dc.subject.keywordAuthor | Maintenance priority index | - |
dc.subject.keywordAuthor | Overhead transmission line | - |
dc.subject.keywordAuthor | Maintenance strategy | - |
dc.subject.keywordAuthor | Reliability centered approach | - |
dc.subject.keywordPlus | SYSTEMS | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Engineering, Electrical & Electronic | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.description.journalRegisteredClass | kci | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
84, Heukseok-ro, Dongjak-gu, Seoul, Republic of Korea (06974)02-820-6194
COPYRIGHT 2019 Chung-Ang University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.