Estimating approximate construction duration of CFRD in the planning stage
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Kim, Kyong Ju | - |
dc.contributor.author | Yun, Won Gun | - |
dc.contributor.author | Kim, In Kyum | - |
dc.date.available | 2019-01-22T14:22:19Z | - |
dc.date.issued | 2016-11 | - |
dc.identifier.issn | 1226-7988 | - |
dc.identifier.issn | 1976-3808 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/1635 | - |
dc.description.abstract | At present, there is no criterion to estimate the construction duration of a dam in the planning stage. Public agents estimate the construction duration of a dam based on their experience or sometimes, their needs. It often results in insufficient construction time during the construction stage. This results in quality deterioration and economic loss because of carrying out work on urgent basis frequently. Therefore, there has been a constant need for the estimation model of construction duration. This study targets Concrete-Faced Rock-fill Dam (CFRD), which is the most constructed type of dams in Korea. It aims to develop a model for the estimation of the construction duration of a dam in the planning stage. For this purpose, standard C.P. is identified from the process planning data, and the properties of the standard C.P. are analyzed to estimate the duration of each activity on C.P., and then two construction duration estimation models for CFRD are proposed. The results show that the two models have an error under 10% when compared with the estimation based on detailed design. | - |
dc.format.extent | 10 | - |
dc.publisher | KOREAN SOCIETY OF CIVIL ENGINEERS-KSCE | - |
dc.title | Estimating approximate construction duration of CFRD in the planning stage | - |
dc.type | Article | - |
dc.identifier.doi | 10.1007/s12205-016-0810-0 | - |
dc.identifier.bibliographicCitation | KSCE JOURNAL OF CIVIL ENGINEERING, v.20, no.7, pp 2604 - 2613 | - |
dc.identifier.kciid | ART002157499 | - |
dc.description.isOpenAccess | N | - |
dc.identifier.wosid | 000385154900003 | - |
dc.identifier.scopusid | 2-s2.0-84959143079 | - |
dc.citation.endPage | 2613 | - |
dc.citation.number | 7 | - |
dc.citation.startPage | 2604 | - |
dc.citation.title | KSCE JOURNAL OF CIVIL ENGINEERING | - |
dc.citation.volume | 20 | - |
dc.type.docType | Article | - |
dc.publisher.location | 대한민국 | - |
dc.subject.keywordAuthor | construction duration | - |
dc.subject.keywordAuthor | estimating duration | - |
dc.subject.keywordAuthor | dam construction | - |
dc.subject.keywordAuthor | CFRD | - |
dc.subject.keywordPlus | COST | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.description.journalRegisteredClass | kci | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
84, Heukseok-ro, Dongjak-gu, Seoul, Republic of Korea (06974)02-820-6194
COPYRIGHT 2019 Chung-Ang University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.