Approximate cost estimating model for PSC Beam bridge based on quantity of standard work

Full metadata record
DC Field Value Language
dc.contributor.authorKim, Kyong Ju-
dc.contributor.authorKim, Kyoungmin-
dc.contributor.authorKang, Chan Sung-
dc.date.available2019-05-30T02:39:33Z-
dc.date.issued2009-11-
dc.identifier.issn1226-7988-
dc.identifier.issn1976-3808-
dc.identifier.urihttps://scholarworks.bwise.kr/cau/handle/2019.sw.cau/22923-
dc.description.abstractThe accuracy of early cost estimates in engineering and construction projects is extremely important to both feasibility study and evaluation of design alternatives. In particular, to evaluate alternatives at the design stage, quick and accurate decision-making is needed under a limited definition of scope and constraints in available information and time. This study suggests an approximate cost estimation model for PSC Beam bridges based on the quantity of standard work. For model development, this study analyzed cost structure and proportion of cost items through bill of materials and quantities, identified 8 representative work items (Manufacturing PSC Beam, material, rebar fabrication/placing, supporting post/scaffolding, form work, slab waterproofing, concrete placing, deck finishing), and established approaches for quantify estimating on the work items. By utilizing the characteristics of bridges, the suggested model supports quick cost estimation with only three input values (length of span, total length of bridge, and width). The developed model is applied to 39 real projects for validation. The result of the application showed the accuracy with estimation error less than 4.04%.-
dc.format.extent12-
dc.language영어-
dc.language.isoENG-
dc.publisherSPRINGER-
dc.titleApproximate cost estimating model for PSC Beam bridge based on quantity of standard work-
dc.typeArticle-
dc.identifier.doi10.1007/s12205-009-0377-0-
dc.identifier.bibliographicCitationKSCE JOURNAL OF CIVIL ENGINEERING, v.13, no.6, pp 377 - 388-
dc.identifier.kciidART001376607-
dc.description.isOpenAccessN-
dc.identifier.wosid000269918400001-
dc.identifier.scopusid2-s2.0-70350236370-
dc.citation.endPage388-
dc.citation.number6-
dc.citation.startPage377-
dc.citation.titleKSCE JOURNAL OF CIVIL ENGINEERING-
dc.citation.volume13-
dc.type.docTypeArticle-
dc.publisher.location대한민국-
dc.subject.keywordAuthorPSC beam bridge-
dc.subject.keywordAuthorapproximate cost estimating-
dc.subject.keywordAuthorstandard section-
dc.subject.keywordAuthorquantity of standard work-
dc.subject.keywordPlusNEURAL-NETWORKS-
dc.subject.keywordPlusREGRESSION-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.description.journalRegisteredClasskci-
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Kyong Ju photo

Kim, Kyong Ju
공과대학 (건설환경플랜트공학)
Read more

Altmetrics

Total Views & Downloads

BROWSE