Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

대북 민간건설공사의 위험대응방안에 관한 사례연구A Case Study on Risk Response Methods to Private Construction Projects in North Korea

Authors
최종규김영애송창영김용수
Issue Date
2007
Publisher
대한건축학회지회연합회
Keywords
Private Construction Project in North Korea; Risk Factor; Risk Defending Plan; 대북민간건설; 위험요인; 위험대응방안; Private Construction Project in North Korea; Risk Factor; Risk Defending Plan
Citation
대한건축학회연합논문집, v.9, no.4, pp 201 - 209
Pages
9
Journal Title
대한건축학회연합논문집
Volume
9
Number
4
Start Page
201
End Page
209
URI
https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/30681
ISSN
1229-5752
Abstract
Different from governmental/government-financed construction projects, private construction projects in North Korea are placed in a complex and specific circumstance, thus being involved with a lot of risks. In this vein, it is necessary to take measures to manage such risk factors, but not many private construction projects in North Korea have been carried out so far and data and preceding studies on its risk management plans could be hardly found. Therefore, the purpose of this study was to examine the risks of private construction projects in North Korea and suggest some risk management plans through some examples. For this, the investigator interviewed with people who were working for constructors and their collaborators, and used data on the training of government officials. Study findings are as follows: 1)from planning to completion, risk factors of construction projects in North Korea were analyzed and measures were presented, centering on the approval of construction, shipping of materials, visiting procedures, stays, on-site construction, and safety supervision. 2) since the risk factors of private construction projects in North Korea are quite different from those of general construction projects, it is necessary to talk over a contract with the said party in North Korea fully in advance. 3) since the construction projects in North Korea are carried out in a specific site with which regular contacts are impossible, thorough advanced preparation is a must in order not to face the risks of cost and time.
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > School of Architecture and Building Science > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE