dc.description.abstract | The purpose of this study is to analyze the Probability Costs variation ranges of the cost items from the risk factor model for construction phase of overseas gas plant projects. For this purpose, the risk factors were first examined through literature reviews and the main risk factors were selected according to its level of significance and occurrence rate through interviews with professionals. The percentage changes in the total construction cost for each main risk factors were computed and applied to the example case from the past. Monte-Carlo Simulation was employed on these results to analyze the probabilistic variation range. The results obtained from the above procedure are as follows. First, there were a total of ten risk factors including the schedule changes for materials procurement, the prolonged construction schedule, the modifications in design, and the changes in materials costs. Second, the variation ranges of the cost items affected by the above risk factors are as follows. The labor costs varied from 7,702 to 7,815 million KRW; the subcontracting costs varied from 83,688 to 85,495 million KRW; the contingency allowances varied from 7,330 to 7,468 million KRW. | - |
dc.format.extent | 8 | - |
dc.publisher | 대한건축학회 | - |
dc.title | 해외 가스 플랜트 시공단계의 위험요인 모델을 통한 비용 항목별 확률적 비용 변동범위 분석 | - |
dc.title.alternative | An Analysis on the Probability Costs Variation Ranges of the Cost Items from the Risk Factor Model for Construction Phase of Overseas Gas Plant Projects | - |
dc.type | Article | - |
dc.identifier.bibliographicCitation | 대한건축학회논문집 구조계, v.28, no.01, pp 191 - 198 | - |
dc.identifier.kciid | ART001630877 | - |
dc.description.isOpenAccess | N | - |
dc.citation.endPage | 198 | - |
dc.citation.number | 01 | - |
dc.citation.startPage | 191 | - |
dc.citation.title | 대한건축학회논문집 구조계 | - |
dc.citation.volume | 28 | - |
dc.publisher.location | 대한민국 | - |
dc.subject.keywordAuthor | 가스 플랜트 | - |
dc.subject.keywordAuthor | 위험요인 | - |
dc.subject.keywordAuthor | 비용 변동범위 | - |
dc.subject.keywordAuthor | 몬테카를로 시뮬레이션 | - |
dc.subject.keywordAuthor | Gas Plant | - |
dc.subject.keywordAuthor | Risk Factor | - |
dc.subject.keywordAuthor | Cost Variation Range | - |
dc.subject.keywordAuthor | Monte-Carlo Simulation | - |
dc.description.journalRegisteredClass | kci | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
84, Heukseok-ro, Dongjak-gu, Seoul, Republic of Korea (06974)02-820-6194
COPYRIGHT 2019 Chung-Ang University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.