Flexibility-Based Reserve Scheduling of Pumped Hydroelectric Energy Storage in Korea
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Min, Chang-Gi | - |
dc.contributor.author | Kim, Mun Kyeom | - |
dc.date.available | 2019-03-08T07:56:47Z | - |
dc.date.issued | 2017-10 | - |
dc.identifier.issn | 1996-1073 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/3880 | - |
dc.description.abstract | The high penetration of renewable energy resources has made it harder to secure a flexible power system. Accordingly, this has become an issue in operating power systems. As a possible solution, pumped hydroelectric energy storage (PHES) has received much attention because of its fast start-up and ramp characteristics. This study proposes a flexibility-based reserve scheduling method for PHES. In this method, the reserve scheduling of PHES was conducted to improve flexibility; the associated risk index was termed the ramping capability shortage expectation (RSE). The peak-load days in 2016 and 2029 were selected to examine the applicability and performance of the proposed method. Results indicate that the proposed method can improve the flexibility by 4.45% for 2016 and 0.9% for 2029, respectively. | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | MDPI AG | - |
dc.title | Flexibility-Based Reserve Scheduling of Pumped Hydroelectric Energy Storage in Korea | - |
dc.type | Article | - |
dc.identifier.doi | 10.3390/en10101478 | - |
dc.identifier.bibliographicCitation | ENERGIES, v.10, no.10 | - |
dc.description.isOpenAccess | Y | - |
dc.identifier.wosid | 000414578400033 | - |
dc.identifier.scopusid | 2-s2.0-85035103740 | - |
dc.citation.number | 10 | - |
dc.citation.title | ENERGIES | - |
dc.citation.volume | 10 | - |
dc.type.docType | Article | - |
dc.publisher.location | 스위스 | - |
dc.subject.keywordAuthor | flexibility | - |
dc.subject.keywordAuthor | pumped hydroelectric storage | - |
dc.subject.keywordAuthor | ramping capability shortage expectation | - |
dc.subject.keywordAuthor | renewable energy resources | - |
dc.subject.keywordAuthor | reserve scheduling | - |
dc.subject.keywordPlus | POWER-PLANTS | - |
dc.subject.keywordPlus | SYSTEM | - |
dc.subject.keywordPlus | WIND | - |
dc.subject.keywordPlus | OPERATION | - |
dc.relation.journalResearchArea | Energy & Fuels | - |
dc.relation.journalWebOfScienceCategory | Energy & Fuels | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
84, Heukseok-ro, Dongjak-gu, Seoul, Republic of Korea (06974)02-820-6194
COPYRIGHT 2019 Chung-Ang University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.