Detailed Information

Cited 15 time in webofscience Cited 0 time in scopus
Metadata Downloads

Automated Schedule Updates Using As-Built Data and a 4D Building Information Model

Full metadata record
DC Field Value Language
dc.contributor.authorSon, Hyojoo-
dc.contributor.authorKim, Changwan-
dc.contributor.authorCho, Yong Kwon-
dc.date.available2019-03-08T08:37:06Z-
dc.date.issued2017-07-
dc.identifier.issn0742-597X-
dc.identifier.issn1943-5479-
dc.identifier.urihttps://scholarworks.bwise.kr/cau/handle/2019.sw.cau/4233-
dc.description.abstractA schedule update is defined as a process for measuring the status of a project, predicting the date of its completion, and providing project managers with critical schedule information. The updated schedule information helps project managers evaluate their projects and take appropriate actions that will enable them to finish projects on time. In current practice, most schedule-update processes are performed manually, require considerable time and effort, and rely on subjective experience. This study proposes data flow and develops a system that updates schedules automatically through the use of project-management software and provides critical schedule information to project managers. The proposed system is based on the use of three-dimensional (3D) point-cloud data from construction sites and a four-dimensional (4D) model that includes an as-planned schedule. To verify the performance of the system developed in this study, a case study based on an actual construction site was conducted. The results show that the proposed system contributes to the automation of all steps involved in schedule updating. With automatic schedule updates, the practice can be made more efficient, and the process of schedule updating can be performed in a reliable and objective manner. (C) 2017 American Society of Civil Engineers.-
dc.language영어-
dc.language.isoENG-
dc.publisherASCE-AMER SOC CIVIL ENGINEERS-
dc.titleAutomated Schedule Updates Using As-Built Data and a 4D Building Information Model-
dc.typeArticle-
dc.identifier.doi10.1061/(ASCE)ME.1943-5479.0000528-
dc.identifier.bibliographicCitationJOURNAL OF MANAGEMENT IN ENGINEERING, v.33, no.4-
dc.description.isOpenAccessN-
dc.identifier.wosid000399808200018-
dc.identifier.scopusid2-s2.0-85018829417-
dc.citation.number4-
dc.citation.titleJOURNAL OF MANAGEMENT IN ENGINEERING-
dc.citation.volume33-
dc.type.docTypeArticle-
dc.publisher.location미국-
dc.subject.keywordAuthorAs-built data-
dc.subject.keywordAuthorAutomated schedule update-
dc.subject.keywordAuthorProject-management software-
dc.subject.keywordAuthorProgress measurement-
dc.subject.keywordAuthorFour-dimensional (4D) building information model-
dc.subject.keywordPlusCONSTRUCTION PROJECTS-
dc.subject.keywordPlusPROGRESS MEASUREMENT-
dc.subject.keywordPlusPERFORMANCE CONTROL-
dc.subject.keywordPlus3D DATA-
dc.subject.keywordPlusREGISTRATION-
dc.subject.keywordPlusCAD-
dc.subject.keywordPlusMANAGEMENT-
dc.subject.keywordPlusDELAY-
dc.subject.keywordPlusCOST-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryEngineering, Industrial-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
Files in This Item
There are no files associated with this item.
Appears in
Collections
College of Engineering > ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Kim, Chang wan photo

Kim, Chang wan
공과대학 (건축공학)
Read more

Altmetrics

Total Views & Downloads

BROWSE