Structural performance of continuity connection for decked bulb tee girders
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Ji, S.W. | - |
dc.contributor.author | Shim, C.S. | - |
dc.contributor.author | Kim, D.W. | - |
dc.contributor.author | Bae, H.U. | - |
dc.date.accessioned | 2021-09-23T06:40:18Z | - |
dc.date.available | 2021-09-23T06:40:18Z | - |
dc.date.issued | 2013 | - |
dc.identifier.issn | 0000-0000 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/49639 | - |
dc.description.abstract | In order to minimize on-site construction, a decked bulb tee (DBT) girder with full-depth concrete deck was proposed. As usage of the precast girder has been increased, interest of connection between girders has been grown in these days. Connection detail has become a critical issue to control girder performance in terms of crack control, strength and rotation capacity of connection part. The purpose of this paper is to suggest recommendation of suitable continuity connection detail for the DBT girders and to verify structural performance of transverse connection detail. Experiment of a small scale-model of DBT girder was performed and recommended connection detail in this paper was based on experimental verification which focused on efficiency of strength, ductility and rotational capacity. | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | Hokkaido University collection of Scholarly Academic Papers, HUSCAP | - |
dc.title | Structural performance of continuity connection for decked bulb tee girders | - |
dc.type | Article | - |
dc.identifier.bibliographicCitation | Proceedings of the 13th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC 2013 | - |
dc.description.isOpenAccess | N | - |
dc.identifier.scopusid | 2-s2.0-84905281782 | - |
dc.citation.title | Proceedings of the 13th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC 2013 | - |
dc.type.docType | Conference Paper | - |
dc.subject.keywordAuthor | Accelerated construction | - |
dc.subject.keywordAuthor | Continuous structure | - |
dc.subject.keywordAuthor | Decked bulb tee girder (DBT) | - |
dc.subject.keywordAuthor | Precast concrete | - |
dc.subject.keywordAuthor | Transverse joint | - |
dc.subject.keywordPlus | Precast concrete | - |
dc.subject.keywordPlus | Structural design | - |
dc.subject.keywordPlus | Accelerated constructions | - |
dc.subject.keywordPlus | Bulb-tee girders | - |
dc.subject.keywordPlus | Continuous structures | - |
dc.subject.keywordPlus | Experimental verification | - |
dc.subject.keywordPlus | On-site construction | - |
dc.subject.keywordPlus | Rotational capacity | - |
dc.subject.keywordPlus | Structural performance | - |
dc.subject.keywordPlus | Transverse joints | - |
dc.subject.keywordPlus | Beams and girders | - |
dc.description.journalRegisteredClass | scopus | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
84, Heukseok-ro, Dongjak-gu, Seoul, Republic of Korea (06974)02-820-6194
COPYRIGHT 2019 Chung-Ang University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.