A Model for Risk Cost and Bidding Price Prediction based on Risk Information in Plant Construction Projects
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Kang, Hyun-Wook | - |
dc.contributor.author | Kim, Yong-Su | - |
dc.date.available | 2019-01-22T12:30:04Z | - |
dc.date.issued | 2018-11 | - |
dc.identifier.issn | 1226-7988 | - |
dc.identifier.issn | 1976-3808 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/cau/handle/2019.sw.cau/627 | - |
dc.description.abstract | The purpose of this study is to predict the risk cost and the bidding price of a plant construction project based on the surveyed risk information. This is carried out by analyzing the risk information of completed plant construction projects and by applying it to a new project. Accordingly, a model structure is designed and a prototype program is developed for the analysis. In addition, a case study is conducted using this prototype program to demonstrate the model's conformity and practicability. The methodology, process, and main results of this study are as follows. 1) Based on the risk information collected from the completed construction projects, a model structure is designed and its prototype program is developed to predict the risk cost and the bidding price of a new construction project. The advantage of using this program is that it provides quick and reliable analysis of risk information, which can be used effectively in time-limited circumstances such as the project bidding stage. 2) A case study is conducted to verify the conformity and practicability of the prototype program by analyzing the risk information of two completed plant projects. Moreover, using this risk information, the risk cost and the bidding price of a new plant project is estimated. As a result, the proposed model and the prototype program are examined to give a proper estimation of the bidding price, considering the risk cost in plant construction projects. | - |
dc.format.extent | 15 | - |
dc.publisher | KOREAN SOCIETY OF CIVIL ENGINEERS-KSCE | - |
dc.title | A Model for Risk Cost and Bidding Price Prediction based on Risk Information in Plant Construction Projects | - |
dc.type | Article | - |
dc.identifier.doi | 10.1007/s12205-018-0587-4 | - |
dc.identifier.bibliographicCitation | KSCE JOURNAL OF CIVIL ENGINEERING, v.22, no.11, pp 4215 - 4229 | - |
dc.identifier.kciid | ART002395803 | - |
dc.description.isOpenAccess | N | - |
dc.identifier.wosid | 000450794800004 | - |
dc.identifier.scopusid | 2-s2.0-85047392395 | - |
dc.citation.endPage | 4229 | - |
dc.citation.number | 11 | - |
dc.citation.startPage | 4215 | - |
dc.citation.title | KSCE JOURNAL OF CIVIL ENGINEERING | - |
dc.citation.volume | 22 | - |
dc.type.docType | Article | - |
dc.publisher.location | 대한민국 | - |
dc.subject.keywordAuthor | risk information | - |
dc.subject.keywordAuthor | risk cost | - |
dc.subject.keywordAuthor | bidding price | - |
dc.subject.keywordAuthor | plant construction | - |
dc.subject.keywordAuthor | risk impact | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.description.journalRegisteredClass | kci | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
84, Heukseok-ro, Dongjak-gu, Seoul, Republic of Korea (06974)02-820-6194
COPYRIGHT 2019 Chung-Ang University All Rights Reserved.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.