Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Improvement of Productivity through the Reduction of Unexpected Equipment Faults in Die Attach Equipment

Full metadata record
DC Field Value Language
dc.contributor.authorPark, You-Jin-
dc.contributor.authorHur, Sun-
dc.date.accessioned2021-06-22T09:05:39Z-
dc.date.available2021-06-22T09:05:39Z-
dc.date.issued2020-04-
dc.identifier.issn2227-9717-
dc.identifier.issn2227-9717-
dc.identifier.urihttps://scholarworks.bwise.kr/erica/handle/2021.sw.erica/1199-
dc.description.abstractAs one of the semiconductor back-end processes, die attach process is the process that attaches an individual non-defective die (or chip) produced from the semiconductor front-end production to the lead frame on a strip. With most other processes of semiconductor manufacturing, it is very important to improve productivity by lessening the occurrence of defective products generally represented as losses, and then find the fault causes which lower productivity of the die attach process. Thus, as the case study to analyze quantitatively the faults of the die attach process equipment, in this research, we developed analysis systems including statistical analysis functions to improve the productivity of die attach process. This research shows that the developed system can find the causes of equipment faults in die attach process equipment and help improve the productivity of the die attach process by controlling the critical parameters which cause unexpected equipment faults and losses.-
dc.format.extent18-
dc.language영어-
dc.language.isoENG-
dc.publisherMDPI-
dc.titleImprovement of Productivity through the Reduction of Unexpected Equipment Faults in Die Attach Equipment-
dc.typeArticle-
dc.publisher.location스위스-
dc.identifier.doi10.3390/pr8040394-
dc.identifier.scopusid2-s2.0-85086701235-
dc.identifier.wosid000536891900018-
dc.identifier.bibliographicCitationPROCESSES, v.8, no.4, pp 1 - 18-
dc.citation.titlePROCESSES-
dc.citation.volume8-
dc.citation.number4-
dc.citation.startPage1-
dc.citation.endPage18-
dc.type.docTypeArticle-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalWebOfScienceCategoryEngineering, Chemical-
dc.subject.keywordAuthordie attach process-
dc.subject.keywordAuthorwafer sawing process-
dc.subject.keywordAuthorback grinding process-
dc.subject.keywordAuthorunexpected equipment fault-
dc.subject.keywordAuthorloss-
dc.subject.keywordAuthoroverall equipment effectiveness (OEE)-
dc.subject.keywordAuthorunit per equipment hour (UPEH)-
dc.subject.keywordAuthorproductivity analysis system-
dc.identifier.urlhttps://www.mdpi.com/2227-9717/8/4/394-
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > DEPARTMENT OF INDUSTRIAL & MANAGEMENT ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Hur, Sun photo

Hur, Sun
ERICA 공학대학 (DEPARTMENT OF INDUSTRIAL & MANAGEMENT ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE