Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

린 건설 기반의 IPD 프로젝트 사례연구를 통한 Preconstruction 단계의 적용 방안 도출을 위한 기초연구A study on the application of Pre-construction phase IPD through the case study of IPD project based on lean construction

Other Titles
A study on the application of Pre-construction phase IPD through the case study of IPD project based on lean construction
Authors
안용한장한별장활제김별
Issue Date
Nov-2019
Publisher
한국건설관리학회
Keywords
건설관리; 발주방식; 린건설; 통합발주방식; Construction management; Delivery method; Lean construction; Integrated delivery method
Citation
2019년 한국건설관리학회 정기학술발표대회 논문집, pp 51 - 52
Pages
2
Indexed
OTHER
Journal Title
2019년 한국건설관리학회 정기학술발표대회 논문집
Start Page
51
End Page
52
URI
https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/2234
Files in This Item
There are no files associated with this item.
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > MAJOR IN ARCHITECTURAL ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Ahn, Yong Han photo

Ahn, Yong Han
ERICA 공학대학 (MAJOR IN ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE