Operation and preventive maintenance scheduling for containerships: Mathematical model and solution algorithm
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Go, Hun | - |
dc.contributor.author | Kim, Ji-Su | - |
dc.contributor.author | Lee, Dong-Ho | - |
dc.date.accessioned | 2021-06-23T02:42:33Z | - |
dc.date.available | 2021-06-23T02:42:33Z | - |
dc.date.issued | 2013-09 | - |
dc.identifier.issn | 0377-2217 | - |
dc.identifier.issn | 1872-6860 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/27101 | - |
dc.description.abstract | This paper considers the problem of determining operation and maintenance schedules for a containership equipped with various subsystems during its sailing according to a pre-determined navigation schedule. The operation schedule, which specifies working time of each subsystem, determines the due-date of each maintenance activity and the maintenance schedule specifies the actual start time of each maintenance activity. The main constraints are subsystem requirements, workforce availability, working time limitation, and inter-maintenance time. To represent the problem mathematically, a mixed integer programming model is developed. Then, due to the complexity of the problem, we suggest a heuristic algorithm that minimizes the sum of earliness and tardiness between the due-date and the actual start time for each maintenance activity. Computational experiments were done on various test instances and the results are reported. In particular, a case study was done on a real instance and a significant amount of improvement is reported over the experience based conventional method. (c) 2013 Elsevier B.V. All rights reserved. | - |
dc.format.extent | 11 | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | ELSEVIER | - |
dc.title | Operation and preventive maintenance scheduling for containerships: Mathematical model and solution algorithm | - |
dc.type | Article | - |
dc.publisher.location | 네델란드 | - |
dc.identifier.doi | 10.1016/j.ejor.2013.04.005 | - |
dc.identifier.scopusid | 2-s2.0-84877713728 | - |
dc.identifier.wosid | 000319851800007 | - |
dc.identifier.bibliographicCitation | EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.229, no.3, pp 626 - 636 | - |
dc.citation.title | EUROPEAN JOURNAL OF OPERATIONAL RESEARCH | - |
dc.citation.volume | 229 | - |
dc.citation.number | 3 | - |
dc.citation.startPage | 626 | - |
dc.citation.endPage | 636 | - |
dc.type.docType | Article | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Business & Economics | - |
dc.relation.journalResearchArea | Operations Research & Management Science | - |
dc.relation.journalWebOfScienceCategory | Management | - |
dc.relation.journalWebOfScienceCategory | Operations Research & Management Science | - |
dc.subject.keywordPlus | MULTI-COGENERATION PLANTS | - |
dc.subject.keywordPlus | THERMAL GENERATING-UNITS | - |
dc.subject.keywordPlus | POWER-SYSTEMS | - |
dc.subject.keywordAuthor | Containerships | - |
dc.subject.keywordAuthor | Operation and maintenance scheduling | - |
dc.subject.keywordAuthor | Integer programming | - |
dc.subject.keywordAuthor | Heuristic | - |
dc.identifier.url | https://www.sciencedirect.com/science/article/pii/S0377221713003032?via%3Dihub | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
55 Hanyangdeahak-ro, Sangnok-gu, Ansan, Gyeonggi-do, 15588, Korea+82-31-400-4269 sweetbrain@hanyang.ac.kr
COPYRIGHT © 2021 HANYANG UNIVERSITY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.