Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Half-PC 보와 현장타설 콘크리트의 경계면에 배근된 비인장 강연선의 부착응력-슬립 모델 및 정착길이

Full metadata record
DC Field Value Language
dc.contributor.author노삼영-
dc.contributor.author김형근-
dc.contributor.author이준호-
dc.contributor.author조민주-
dc.date.accessioned2021-06-23T09:07:10Z-
dc.date.available2021-06-23T09:07:10Z-
dc.date.issued2012-03-
dc.identifier.issn1226-9107-
dc.identifier.urihttps://scholarworks.bwise.kr/erica/handle/2021.sw.erica/35795-
dc.description.abstractThe purpose of this research is to obtain development length and bond slip relationship of the untensioned wire strand, applied to the precast concrete beam-column joint system developed recently. For this the pull-out tests were performed, in which the main test parameters are diameter of strands (9.3mm, 12.7mm, bundle), embedment length and distance from the precast concrete surface to the strand. A estimation equation of the development length was proposed based on test result. Herein 5% fractil value with 90% reliability was considered. The development length estimated by the proposed equation is comparable with that of the untensioned wire strand suggested in CEP-FIP Model Code 1990. Half-Precast concrete and topping concrete interface was proposed as an additional new bond condition for the strand location coefficient  in the equation of MC-90. Additionally a bond stress-slip model was established by means of a numerical algorithm applying the strand strain obtained from the pullout tests mentioned above. The development length obtained by numerical analysis using this bond-slip model agrees with the test result.-
dc.format.extent12-
dc.language한국어-
dc.language.isoKOR-
dc.publisher대한건축학회-
dc.titleHalf-PC 보와 현장타설 콘크리트의 경계면에 배근된 비인장 강연선의 부착응력-슬립 모델 및 정착길이-
dc.title.alternativeBond Stress-Slip Model and Development Length of Untensioned Wire Strand Placed on the Interface between Half-PC Beam and Topping Concrete-
dc.typeArticle-
dc.publisher.location대한민국-
dc.identifier.bibliographicCitation대한건축학회논문집 구조계, v.28, no.03, pp 3 - 14-
dc.citation.title대한건축학회논문집 구조계-
dc.citation.volume28-
dc.citation.number03-
dc.citation.startPage3-
dc.citation.endPage14-
dc.identifier.kciidART001649256-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClasskci-
dc.subject.keywordAuthor비인장 강연선-
dc.subject.keywordAuthor인발실험-
dc.subject.keywordAuthor정착길이-
dc.subject.keywordAuthor부착응력-슬립관계-
dc.subject.keywordAuthorUntensioned Wire Strand-
dc.subject.keywordAuthorPull-Out Test-
dc.subject.keywordAuthorDevelopment Length-
dc.subject.keywordAuthorBond Stress-Slip Relationship-
dc.identifier.urlhttps://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE01815992-
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > MAJOR IN ARCHITECTURAL ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Noh, Sam Young photo

Noh, Sam Young
ERICA 공학대학 (MAJOR IN ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE