BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Lee, Joo-sung | - |
dc.contributor.author | Kwon, Nahyun | - |
dc.contributor.author | Ham, Nam-hyuk | - |
dc.contributor.author | Kim, Jae-jun | - |
dc.contributor.author | Ahn, Yong-han | - |
dc.date.accessioned | 2021-06-22T11:03:07Z | - |
dc.date.available | 2021-06-22T11:03:07Z | - |
dc.date.issued | 2019-00 | - |
dc.identifier.issn | 1687-8086 | - |
dc.identifier.issn | 1687-8094 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/4699 | - |
dc.description.abstract | Since the concept of building information modeling (BIM) was introduced in South Korea in 2008, digital fabrication concerning free-form shapes and complex parametric information has been expanding owing to the development of BIM software and tools. However, the digital fabrication process is inadequate in terms of efficiency and productivity because of the need to convert from conventional two-dimensional (2D) drawings to a BIM design; this adversely affects the unified design, fabrication, installation, and inspection processes. Moreover, an optimized process has not been developed thus far because the productivity of digital fabrication has not been quantitatively verified for various projects in the field. This study proposes a BIM-based digital fabrication process for prefabricated parts of buildings. In addition, a productivity analysis method based on the queuing model is proposed using personnel input and performance calculation data to verify productivity. It is expected that the digital fabrication process and productivity analysis model proposed here will be applied to complex digital fabrication works. | - |
dc.format.extent | 19 | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | HINDAWI LTD | - |
dc.title | BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea | - |
dc.type | Article | - |
dc.publisher.location | 영국 | - |
dc.identifier.doi | 10.1155/2019/4163625 | - |
dc.identifier.scopusid | 2-s2.0-85068864504 | - |
dc.identifier.wosid | 000474816700001 | - |
dc.identifier.bibliographicCitation | ADVANCES IN CIVIL ENGINEERING, v.2019, pp 1 - 19 | - |
dc.citation.title | ADVANCES IN CIVIL ENGINEERING | - |
dc.citation.volume | 2019 | - |
dc.citation.startPage | 1 | - |
dc.citation.endPage | 19 | - |
dc.type.docType | Article | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Construction & Building Technology | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalWebOfScienceCategory | Construction & Building Technology | - |
dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
dc.subject.keywordPlus | CONSTRUCTION | - |
dc.subject.keywordPlus | PRODUCTIVITY | - |
dc.subject.keywordPlus | DESIGN | - |
dc.identifier.url | https://www.hindawi.com/journals/ace/2019/4163625/ | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
55 Hanyangdeahak-ro, Sangnok-gu, Ansan, Gyeonggi-do, 15588, Korea+82-31-400-4269 sweetbrain@hanyang.ac.kr
COPYRIGHT © 2021 HANYANG UNIVERSITY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.