철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 -
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 김환용 | - |
dc.contributor.author | 신민호 | - |
dc.contributor.author | 한상천 | - |
dc.contributor.author | 최영우 | - |
dc.contributor.author | 김창호 | - |
dc.date.accessioned | 2021-06-22T11:21:33Z | - |
dc.date.available | 2021-06-22T11:21:33Z | - |
dc.date.issued | 2018-12 | - |
dc.identifier.issn | 2288-1697 | - |
dc.identifier.uri | https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/5110 | - |
dc.description.abstract | Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction. | - |
dc.format.extent | 8 | - |
dc.language | 한국어 | - |
dc.language.iso | KOR | - |
dc.publisher | 한국BIM학회 | - |
dc.title | 철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 - | - |
dc.title.alternative | Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway - | - |
dc.type | Article | - |
dc.publisher.location | 대한민국 | - |
dc.identifier.doi | 10.13161/kibim.2018.8.4.041 | - |
dc.identifier.bibliographicCitation | 한국BIM학회논문집 , v.8, no.4, pp 41 - 48 | - |
dc.citation.title | 한국BIM학회논문집 | - |
dc.citation.volume | 8 | - |
dc.citation.number | 4 | - |
dc.citation.startPage | 41 | - |
dc.citation.endPage | 48 | - |
dc.identifier.kciid | ART002430586 | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | kci | - |
dc.subject.keywordAuthor | BIM활용 | - |
dc.subject.keywordAuthor | 비용편익분석 | - |
dc.subject.keywordAuthor | 공기단축 | - |
dc.subject.keywordAuthor | 철도인프라 | - |
dc.subject.keywordAuthor | 리스크 비용 | - |
dc.subject.keywordAuthor | BIM Application | - |
dc.subject.keywordAuthor | Cost-Benefit Analysis | - |
dc.subject.keywordAuthor | Construction Shortening Period | - |
dc.subject.keywordAuthor | Railway Infrastructure | - |
dc.subject.keywordAuthor | Risk Cost | - |
dc.identifier.url | https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART002430586 | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
55 Hanyangdeahak-ro, Sangnok-gu, Ansan, Gyeonggi-do, 15588, Korea+82-31-400-4269 sweetbrain@hanyang.ac.kr
COPYRIGHT © 2021 HANYANG UNIVERSITY. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.