Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders

Full metadata record
DC Field Value Language
dc.contributor.authorKim, Min-Soo-
dc.contributor.authorKim, Jong-Soo-
dc.contributor.authorSarkar, Biswajit-
dc.contributor.authorSarkar, Mitali-
dc.contributor.authorIqbal, Muhammad Waqas-
dc.date.accessioned2021-06-22T12:02:52Z-
dc.date.available2021-06-22T12:02:52Z-
dc.date.created2021-01-21-
dc.date.issued2018-04-
dc.identifier.issn0278-6125-
dc.identifier.urihttps://scholarworks.bwise.kr/erica/handle/2021.sw.erica/6376-
dc.description.abstractThis paper investigates an improved way to calculate imperfect items in an integrated inventory model with distribution free approach for lead time demand to simultaneously optimize lot size, safety factor, number of shipments, and lead time. The backorder rate depends on the reduced lead time. Due to the quality of products, each item is inspected by the buyer and defective items are sent to the supplier during delivery of the next lot. Some investments are used to improve the quality of products and reduce the setup cost. The model is solved by using distribution free approach with known mean and standard deviation. An improved solution methodology is designed and a lemma is constructed to obtain global optimum solution of the integrated model. An improved algorithm is designed to approach the global optimal solution. Five numerical examples and two special cases are provided to validate the suggested model. A case study is conducted for which the global optimum solution is obtained using the proposed solution methodology. Simplified versions of the proposed model, illustrated through numerical examples as special cases, converged over the existing theories. Some managerial insights are provided to help managers implement the suggested model in real time situations.-
dc.language영어-
dc.language.isoen-
dc.publisherELSEVIER SCI LTD-
dc.titleAn improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders-
dc.typeArticle-
dc.contributor.affiliatedAuthorKim, Jong-Soo-
dc.identifier.doi10.1016/j.jmsy.2018.04.016-
dc.identifier.scopusid2-s2.0-85046736866-
dc.identifier.wosid000435061400013-
dc.identifier.bibliographicCitationJOURNAL OF MANUFACTURING SYSTEMS, v.47, pp.153 - 167-
dc.relation.isPartOfJOURNAL OF MANUFACTURING SYSTEMS-
dc.citation.titleJOURNAL OF MANUFACTURING SYSTEMS-
dc.citation.volume47-
dc.citation.startPage153-
dc.citation.endPage167-
dc.type.rimsART-
dc.type.docTypeArticle-
dc.description.journalClass1-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalResearchAreaOperations Research & Management Science-
dc.relation.journalWebOfScienceCategoryEngineering, Industrial-
dc.relation.journalWebOfScienceCategoryEngineering, Manufacturing-
dc.relation.journalWebOfScienceCategoryOperations Research & Management Science-
dc.subject.keywordPlusSETUP COST REDUCTION-
dc.subject.keywordPlusVARIABLE LEAD TIME-
dc.subject.keywordPlusQUALITY IMPROVEMENT-
dc.subject.keywordPlusINVESTMENT-
dc.subject.keywordPlusDETERIORATION-
dc.subject.keywordPlusSYSTEM-
dc.subject.keywordPlusPOLICY-
dc.subject.keywordAuthorImperfect production-
dc.subject.keywordAuthorQuality control-
dc.subject.keywordAuthorDistribution systems-
dc.subject.keywordAuthorInventory management-
dc.subject.keywordAuthorBackorder-
dc.identifier.urlhttps://www.sciencedirect.com/science/article/pii/S0278612518300578?via%3Dihub-
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > DEPARTMENT OF INDUSTRIAL & MANAGEMENT ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE