Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출Building Commissioning Management Framework from the Case Study of Green Building

Other Titles
Building Commissioning Management Framework from the Case Study of Green Building
Authors
정진학박소연송동훈안용한
Issue Date
Aug-2018
Publisher
대한건축학회
Keywords
Commissioning; LEED; Management Elements; Energy Efficiency; 커미셔닝; 녹색건축물인증제도; 관리요소; 에너지 효율성
Citation
대한건축학회논문집, v.34, no.8, pp 23 - 30
Pages
8
Indexed
KCI
Journal Title
대한건축학회논문집
Volume
34
Number
8
Start Page
23
End Page
30
URI
https://scholarworks.bwise.kr/erica/handle/2021.sw.erica/7379
DOI
10.5659/JAIK_PD.2018.34.8.23
ISSN
2733-6239
2733-6247
Abstract
최근 지구 온난화와 에너지 소비량의 증가 등의 이유로 에너지 효율성의 증가가 중요한 요소로 대두되고있다. 커미셔닝은 건물의 유지관리비용 및 에너지 효율성 증가를 위한 효과적인 방법이다. 본 연구에서는 녹색건축물 인증에서의 커미셔닝 프로세스를 도출하고 국내 커미셔닝 프로젝트 수행시 활용될 수 있는 관리요소를 도출하기 위해 미국의 선진 사례에 대한 사례연구를 진행 하였다.
A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.
Files in This Item
Go to Link
Appears in
Collections
COLLEGE OF ENGINEERING SCIENCES > MAJOR IN ARCHITECTURAL ENGINEERING > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher Ahn, Yong Han photo

Ahn, Yong Han
ERICA 공학대학 (MAJOR IN ARCHITECTURAL ENGINEERING)
Read more

Altmetrics

Total Views & Downloads

BROWSE